Daily Report |
![]() |
CPUC Environmental Monitoring Activities |
SFPP Carson to Norwalk Project |
| Aspen Environmental Group | Thursday, May 5, 1999 |
Construction Highlights
The shift started with the weekly meeting between the applicant and the contractor to discuss the schedule and issues of concern.
Spread 1
City of Long Beach
Spread 1 work in the City of Long Beach has been completed.
City of Paramount
No Spread 1 work occurred in the City of Paramount during the shift.
City of Bellflower
The excavator completed excavation of the bore receiving pit and set the trench boxes. The end of the 30-inch casing is exposed in the bottom of the pit.
City of Cerritos
The boring crew at the San Gabriel River pulled the augers and removed the machine from the pit. A small crew worked on cleaning out the casing pipe and the welder attached hangers for the conduit. The applicant was informed of concern over small oil spills from the boring crews crane.
City of Artesia
No work occurred in the City of Artesia during the shift.
City of Norwalk
The backfilling crew completed pouring one-sack slurry to grade on Norwalk Blvd. The paving moved back to a skip to the south on Norwalk Blvd.
Spread 2
Los Angeles County
The crew at the Compton Creek Bridge worked on the fittings on the south side of the bridge. The crew had initial difficulties with the bends leading to the bridge. The pipelaying and welding on the south side of the bridge was completed by the end of the shift. The backfilling crew worked on the support for the valve on the south side of Compton Creek.
City of Long Beach
The crew at the Los Angeles River laid and welded the section of pipe between the 710 Freeway bore and the Los Angeles River bore. A small crew poured slurry at DeForest Park.
City of Paramount
No work occurred in the City of Paramount during the shift.
Watson Station
City of Carson
The crew at the Watson Station continued to work on the electrical connections and the vapor recovery tanks. The crews also welded the connections on the north side of the station.
Norwalk Station
City of Norwalk
The welding crew completed welding the subterranean pipe in the Norwalk Station. The small crew potholed and backfilled inside the station. The mainline pipelaying and welding has been completed on Spread 1.
End of Report