Construction Highlights
Spread 1
City of Long Beach
Spread 1 work in the City of Long Beach has been completed.
City of Paramount
No Spread 1 work occurred in the City of Paramount during the shift.
City of Bellflower
The crew on the west side of the San Gabriel River poured zero-sack slurry around the pipe from the bore receiving pit to the west. The trench shoring boxes were removed from the pit and moved to Palo Verde Avenue for dismantling. The spoil pile was watered to reduce fugitive dust.
City of Cerritos
The crew at the San Gabriel River laid and welded the remaining section of pipe east of the bore pit. The crew placed and welded the valve on the east side of the river bore. The final welds on Spread 1 were completed during the shift and x-ray and coating will occur during the next shift.
City of Artesia
The final paving crew laid the asphalt cap from Pioneer Blvd. to Norwalk Blvd. in the City of Artesia during the shift.
City of Norwalk
No work occurred in the City of Norwalk during the shift.
Spread 2
Los Angeles County
The crew at the Compton Creek Bridge poured zero-sack slurry on the north side of the bridge during the shift. The patches on the pipe over the bridge were painted. The backfilling crew continued pouring the concrete road surface on Santa Fe Avenue south of Compton Creek.
City of Long Beach
The crew at the Los Angeles River continued working on backfilling over the section of pipe between the 710 Freeway bore and the Los Angeles River bore and the bore pit. A small crew worked in DeForest Park to hand dig the trench for the ETS station.
City of Paramount
No work occurred in the City of Paramount during the shift.
Watson Station
City of Carson
The crew at the Watson Station continued to work on the electrical connections. The mainline pipelaying crew hand excavated the trench and bellhole for the final section of 16-inch pipe on Spread 2.
Norwalk Station
City of Norwalk
A small survey crew worked inside the station, recording the location of the new line and existing conduits. The welding crew moved into the station at the end of the shift to weld on the test-heads for the hydrostatic test.