Daily Report |
![]() |
CPUC Environmental Monitoring Activities |
SFPP Carson to Norwalk Project |
| Aspen Environmental Group | Thursday, May 13, 1999 |
Construction Highlights
Spread 1
City of Long Beach
Spread 1 work in the City of Long Beach has been completed.
City of Paramount
No Spread 1 work occurred in the City of Paramount during the shift.
City of Bellflower
The electrical crew worked to set the conduit from the valve on the west side of the San Gabriel River.
City of Cerritos
A small clean-up crew worked on the east side of the San Gabriel River.
City of Artesia
No work occurred in the City of Artesia during the shift.
City of Norwalk
No work occurred in the City of Norwalk during the shift.
Spread 2
Los Angeles County
The backfilling crew worked on the south side of Compton Creek during the shift. The crew removed the steel plates and poured the concrete sidewalk and river bank.
City of Long Beach
The backfilling crew covered the electrical conduit between the valve and the bore receiving pit. Slurry was poured in the small skip at 59th Street on DeForest Avenue.
City of Paramount
No work occurred in the City of Paramount during the shift.
Watson Station
City of Carson
The crew at the Watson Station continued working on the smaller fittings and electrical work. The end of the hydrostatic test section was prepared and the crew waited for the second pig and the water to reach the station.
Norwalk Station
City of Norwalk
The crew at the Norwalk Station started filling the line with water during the shift. The line was packed but not put under pressure during the shift.
End of Report