Daily Report |
![]() |
CPUC Environmental Monitoring Activities |
SFPP Carson to Norwalk Project |
| Aspen Environmental Group | Thursday, May 20, 1999 |
Construction Highlights
Spread 1
City of Long Beach
Spread 1 work in the City of Long Beach has been completed.
City of Paramount
No Spread 1 work occurred in the City of Paramount during the shift.
City of Bellflower
No work occurred on the west side of the San Gabriel River.
City of Cerritos
No work occurred in the City of Cerritos during the shift.
City of Artesia
No work occurred in the City of Artesia during the shift.
City of Norwalk
No work occurred in the City of Norwalk during the shift.
Spread 2
Los Angeles County
A small crew worked at Compton Creek to clean-up the right-of-way and pack the valves on both sides of the creek. The crew painted the valves with yellow paint above grade.
City of Long Beach
The electrical crew continued to work on the power connections on the west side of the Los Angeles River during the shift.
City of Paramount
The final paving crew continued work on Madison Street in the City of Paramount during the shift. A small crew started on the concrete work on Minnesota Avenue.
Watson Station
City of Carson
The crew at the Watson Station continued working on the electrical connections and welding on small diameter lines. A trench box was brought in to provide an enclosure for catching the cleaning pigs. The contractor sprayed water over the area to minimize fugitive dust. The contractor ran brush pigs, carbide pigs and swabs during the shift. The swabs were still dirty at the end of the shift.
Norwalk Station
City of Norwalk
The crew at the Norwalk Station launched the cleaning pigs through the 16-inch line to the Watson Station and maintained the pressure on the three compressors.
Industry Station
City of Industry
A small crew in the Industry Station worked on the hand excavation for the connections to the proposed motors and valves. The crew has excavated much of the trench from the valves to the proposed motor sites without any damage to the burried conduits.
End of Report