STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION
Southern California Edison - Mascot Substation Project
(Application A.09-11-020, filed November 25, 2009) |
|
Welcome to the California Public Utilities Commission (CPUC) website for the California Environmental Quality Act (CEQA) review of proposed construction of Southern California Edison's (SCE) Mascot Substation Project. An application for this project was submitted to the CPUC on November 25, 2009 (Application A.09-11-020). This site provides access to public documents and information relevant to the CEQA review process. |
 |
Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat. |
 |
Background
SCE in its CPUC application (A.0911020), requests to construct a new 66/12 kilovolt (kV) distribution substation (Mascot Substation) and associated 66 kV subtransmission lines, telecommunications connection, and distribution circuits in unincorporated Kings County. Power to the Mascot Substation would be supplied by two existing 66 kV subtransmission lines, Goshen-Hanford 66kV line and Hanford-Liberty 66kV line. The proposed subtransmission lines would occur within approximately 2.0 miles of new right-of-way (ROW). The Proposed Project would consist of the following activities:
- Construction of a new 66/12 kV distribution substation on an approximate five acre site (Mascot Substation);
- Construction of two new 66 kV single-circuit subtransmission line segments to serve the new Mascot Substation. More specifically, the Goshen-Hanford 66 kV subtransmission line would be looped into Mascot Substation and the Hanford-Liberty 66 kV subtransmission line, approximately 2 miles away, would be tapped and connected to the Mascot Substation with a new single-circuit 66 kV subtransmission line segment;
- Construction of four new 12 kV distribution circuits; and
- Construction of facilities to connect the substation to SCE's existing telecommunications system.
The Proposed Project would be located in unincorporated Kings County, California, just east of the City of Hanford. The Mascot Substation would be in the eastern portion of Kings County approximately a few miles west of the Tulare County line. The Proposed Project's subtransmission line alignment originates at the Goshen-Hanford 66kV subtransmission line and would be looped into the proposed Mascot Substation at the intersection of Grangeville Boulevard and 7 ½ Avenue. From the proposed Substation site, another subtransmission line segment would traverse directly south from the substation along private property (7 ½ Avenue extended south to East Hanford-Armona Road), across agricultural and residential areas to connect with the Hanford-Liberty 66kV subtransmission line.
Environmental Review
Current Progress
| Project Milestones - April 2012 |
| Milestone |
Date |
| Application deemed complete by CPUC |
March 2, 2010 |
| Publication of Draft IS/MND |
August 30, 2010 |
| Public Comment Period on IS/MND comment period (30 Days) |
August 30 - September 30, 2010 |
| Publication of Final IS/MND |
November 2010 |
| CPUC grants Permit to Construct (D.1012039) |
December 16, 2010 |
| Start of Construction |
March 2012 |
| Estimated End of Construction |
February 2013 |
|
 |
Construction Progress and Mitigation Monitoring, Reporting, and Compliance Program
The CPUC, as the lead agency, is responsible for ensuring that the Applicant Proposed Measures, mitigation measures, as well as plans reviewed and approved by other agencies, are implemented throughout the construction phase of the Project. The Project documents related to mitigation monitoring are available for public review on the Mitigation Monitoring page on this site.
|
 |
Public Comment Period, Public Meeting, and IS/MND Availability
The Draft IS/MND was available for a 30-day public comment period August 30, 2010 through September 30, 2010.
Public Information Meeting
The CPUC held a public information meeting on Thursday, September 9, 2010 at the Kit Carson Elementary School. The meeting began with a brief presentation providing an overview of the Proposed Project identified to date. Following the presentation, interested parties had the opportunity to provide comments about the project. Comment forms were supplied to those who wished to submit written comments at the meetings. Also available from the public information meeting are the presentation slides shown at the meeting.
Availability of IS/MND
The Final IS/MND was released review in November 2010.
The Notice of Intent (NOI) to adopt the IS/MND and the Draft IS/MND [pdf 7.73mb] were released on August 30, 2010. |
|
Proponent's Environmental Assessment (PEA)
The application and PEA for the Mascot Substation Project may be viewed here:
Application
PEA
Data Requests
The CPUC submits Data Requests to SCE when it needs specific information to support CEQA document preparation. The following are the data requests submitted to date:
Data Request Letter No. 1 (December 23, 2009)
Responses
Data Request Letter No. 2 (April 6, 2010)
Responses
Data Request Letter No. 3 (May 6, 2010)
Responses
|
| |
For Additional Information
The CPUC, through its Environmental Review Team, is managing the environmental review of the project. To request additional information or to be added to the mailing list, please contact us by email, fax, or phone, as follows:
Project email:
Project fax: (415) 896-0332
Voicemail: (415) 962-8430
|
 |