Rate Design Windows

What is a Rate Design Window?

Rate Design Windows are optional filings that utilities can use to revisit rate design issues from a utility's previous GRC Phase II and any other rate design issues that may have arisen in the attrition period (the time between a utility's general rate cases). They are meant to be short and take roughly 5 months from beginning (November-December) to decision (April-May). Utilities can also be directed to file Rate Design Window applications by the CPUC when it anticipates issues that need to be addressed during that period.

Visit the following links to see information on recent Rate Design Windows: