Rules July 2007
TABLE OF CONTENTS
Chapter 1. Rules of Practice and Procedure 11
Article 1. General Provisions 11
1.2. (Rule 1.2) Construction 11
1.3. (Rule 1.3) Definitions 11
1.4. (Rule 1.4) Participation in Proceedings 22
1.5. (Rule 1.5) Form and Size of Tendered Documents 33
1.6. (Rule 1.6) Title Page Requirements 33
1.7. (Rule 1.7) Scope of Filing 44
1.9. (Rule 1.9) Service Generally 55
1.10. (Rule 1.10) Electronic Mail Service 77
1.11. (Rule 1.11) Verification 88
1.12. (Rule 1.12) Amendments and Corrections 99
1.13 (Rule 1.13) Tendering and Review of Document for Filing 1010
1.14. (Rule 1.14) Computation of Time 1212
Article 2. Applications Generally 1212
2.2. (Rule 2.2) Organization and Qualification to Transact Business 1313
2.3. (Rule 2.3) Financial Statement 1313
2.4. (Rule 2.4) CEQA Compliance 1414
2.5. (Rule 2.5) Fees for Recovery of Costs in Preparing EIR 1414
Article 3. Particular Applications 1616
3.1. (Rule 3.1) Construction or Extension of Facilities 1616
3.2. (Rule 3.2) Authority to Increase Rates 2020
3.3. (Rule 3.3) Certificate to Operate 2323
3.4. (Rule 3.4) Abandon Passenger Stage Service 2424
3.5. (Rule 3.5) Debt and Equity 2525
3.6. (Rule 3.6) Transfers and Acquisitions 2727
3.7. (Rule 3.7) Public Road Across Railroad 2828
3.8. (Rule 3.8) Alter or Relocate Existing Railroad Crossing 2929
3.9. (Rule 3.9) Railroad Across Public Road 2929
3.10. (Rule 3.10) Railroad Across Railroad 3030
4.1. (Rule 4.1) Who May Complain 3333
4.2. (Rule 4.2) Form and Contents of Complaint 3333
4.3. (Rule 4.3) Service of Complaints and Instructions to Answer 3535
Article 5. Investigations 3737
Article 7. Categorizing and Scoping Proceedings 3939
7.1. (Rule 7.1) Categorization, Need for Hearing 3939
7.2. (Rule 7.2) Prehearing Conferences 4040
7.3. (Rule 7.3) Scoping Memos 4040
7.4. (Rule 7.4) Consolidation 4141
Article 8. Communications with Decisionmakers and Advisors 4141
8.1. (Rule 8.1) Definitions 4141
8.2. (Rule 8.2) Ex Parte Requirements 4343
8.3. (Rule 8.3) Reporting Ex Parte Communications 4545
8.4. (Rule 8.4) Ex Parte Requirements Prior to Final Categorization 4646
8.5 (Rule 8.5) Communications with Advisors 4646
8.6 (Rule 8.6) Requirements in Proceedings Filed Before January 1, 1998 4646
Article 9. Administrative Law Judges 4747
9.1. (Rule 9.1) Authority 4747
9.2. (Rule 9.2) Motion for Reassignment on Peremptory Challenge 4747
9.3. (Rule 9.3) Motion for Reassignment for Prior Service 4848
9.4. (Rule 9.4) Motion for Reassignment for Cause 4949
9.5. (Rule 9.5) Circumstances Not Constituting Cause 5050
9.6. (Rule 9.6) Administrative Law Judge's Request for Reassignment 5050
10.1. (Rule 10.1) Discovery from Parties 5151
10.2. (Rule 10.2) Subpoenas 5151
Article 11. Law and Motion 5454
11.1. (Rule 11.1) Motions 5454
11.2. (Rule 11.2) Motion to Dismiss 5555
11.3. (Rule 11.3) Motion to Compel or Limit Discovery 5555
11.4. (Rule 11.4) Motion to File Under Seal 5555
11.5. (Rule 11.5) Motion to Seal the Evidentiary Record 5656
12.1. (Rule 12.1) Proposal of Settlement 5656
12.2. (Rule 12.2) Comments 5757
12.3. (Rule 12.3) Hearing where Contested 5858
12.4. (Rule 12.4) Rejection of Settlement 5858
12.5. (Rule 12.5) Adoption Binding, Not Precedential 5959
Article 13. Hearings, Evidence, Briefs and Submission 6060
13.2. (Rule 13.2) Presiding Officer 6060
When evidence is to be taken in a hearing, the assigned Commissioner or assigned Administrative Law Judge shall preside, as follows: 6060
13.3. (Rule 13.3) Assigned Commissioner Presence 6161
13.4. (Rule 13.4) Order of Procedure 6161
13.5. (Rule 13.5) Limiting Number of Witnesses 6262
13.6. (Rule 13.6) Evidence 6262
13.7. (Rule 13.7) Exhibits 6262
13.8. (Rule 13.8) Prepared Testimony 6363
13.9. (Rule 13.9) Official Notice of Facts 6464
13.10. (Rule 13.10) Additional Evidence 6464
13.11. (Rule 13.11) Briefs 6464
13.12. (Rule 13.12) Oral Argument in Adjudicatory Proceeding 6565
Article 14. Recommended Decisions 6565
14.1. (Rule 14.1) Definitions 6565
14.2. (Rule 14.2) Issuance of Recommended Decision 6666
14.3. (Rule 14.3) Comments on Proposed or Alternate Decision 6767
14.4. (Rule 14.4) Appeal and Review of Presiding Officer's Decision 6868
14.5. (Rule 14.5) Comment on Draft or Alternate Resolution 6868
Article 15. Commission Decisions 7171
15.1. (Rule 15.1) Commission Meetings 7171
15.2. (Rule 15.2) Meeting Agenda 7171
15.3. (Rule 15.3) Agenda Item Documents 7272
15.4. (Rule 15.4) Decision in Ratesetting or Quasi-Legislative Proceeding 7373
Article 16. Rehearing, Modification and Time to Comply 7474
16.1. (Rule 16.1) Application for Rehearing 7474
16.2. (Rule 16.2) Parties Eligible to File Applications for Rehearing 7474
16.3 (Rule 16.3) Oral Argument on Application for Rehearing 7575
16.4. (Rule 16.4) Petition for Modification 7676
Article 17. Compensating Intervenors 7878
17.1. (Rule 17.1) Notice of Intent to Claim Compensation 7878
17.2. (Rule 17.2) Eligibility in Phased Proceedings 7979
17.3. (Rule 17.3) Request for Award 7979
17.4. (Rule 17.4) Request for Compensation; Reply to Responses 8080
Any person who signs a pleading or brief, enters an appearance, offers testimony at a hearing, or transacts business with the Commission, by such act represents that he or she is authorized to do so and agrees to comply with the laws of this State; to maintain the respect due to the Commission, members of the Commission and its Administrative Law Judges; and never to mislead the Commission or its staff by an artifice or false statement of fact or law.
Note: Authority cited: Section 1701, Public Utilities Code, Reference: Section 1701, Public Utilities Code,
These rules shall be liberally construed to secure just, speedy, and inexpensive determination of the issues presented. In special cases and for good cause shown, the Commission may permit deviations from the rules.
Note: Authority cited: Section 1701, Public Utilities Code.
(a) "Adjudicatory" proceedings are: (1) enforcement investigations into possible violations of any provision of statutory law or order or rule of the Commission; and (2) complaints against regulated entities, including those complaints that challenge the accuracy of a bill, but excluding those complaints that challenge the reasonableness of rates or charges, past, present, or future.
(b) "Category," "categorization," or "categorized" refers to the procedure whereby a proceeding is determined to be an "adjudicatory," "ratesetting," or "quasi-legislative" proceeding.
(c) "Person" means a natural person or organization.
(d) "Quasi-legislative" proceedings are proceedings that establish policy or rules (including generic ratemaking policy or rules) affecting a class of regulated entities, including those proceedings in which the Commission investigates rates or practices for an entire regulated industry or class of entities within the industry.
(e) "Ratesetting" proceedings are proceedings in which the Commission sets or investigates rates for a specifically named utility (or utilities), or establishes a mechanism that in turn sets the rates for a specifically named utility (or utilities). "Ratesetting" proceedings include complaints that challenge the reasonableness of rates or charges, past, present, or future. Other proceedings may be categorized as ratesetting, as described in Rule 7.1(e)(2).
(f) "Scoping memo" means an order or ruling describing the issues to be considered in a proceeding and the timetable for resolving the proceeding, as described in Rule 7.3.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 1701.1(a), 1701.1(c)(1)-(4), Public Utilities Code.
(a) A person may become a party to a proceeding by:
(1) filing an application, petition, or complaint;
(2) filing (i) a protest or response to an application or petition, or (ii) comments in a rulemaking;
(3) entering an appearance at a prehearing conference or hearing; or
(4) filing a motion to become a party.
(b) A person seeking party status pursuant to subsection (a)(2) through (4) of this rule shall:
(1) fully disclose the persons or entities in whose behalf the filing, appearance or motion is made, and the interest of such persons or entities in the proceeding; and
(2) show that the contentions will be reasonably pertinent to the issues already presented.
(c) The assigned Administrative Law Judge may, where circumstances warrant, deny party status or limit the degree to which a party may participate in the proceeding.
(d) Any person named as a defendant to a complaint, or as a respondent to an investigation or a rulemaking, is a party to the proceeding.
Note: Authority cited: Section 1701, Public Utilities Code.
1.5. (Rule 1.5) Form and Size of Tendered Documents
Documents tendered for filing must be typewritten, printed, or reproduced on paper 8 ½ inches wide and 11 inches long. Any larger attachments must be legibly reduced or folded to the same size. The type must be no smaller than 10 points. The impression must use 1 ½ -line or double spacing, except that footnotes and quotations in excess of a few lines may be single-spaced. Both sides of the paper may be used. A document of more than one page must be bound on the left side or upper left-hand corner. If a transmittal letter is submitted (see Rule 1.13(a)), it must not be bound to the tendered document. All copies must be clear and permanently legible.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution.
(a) All documents tendered for filing must have a blank space of at least 1 ½ inches tall by 2 ½ inches wide in the upper right-hand corner for a docket stamp and must show on the first page:
(1) at the top, the heading "BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA";
(2) in the upper left below the heading, the caption for the proceeding;
(3) to the right of the caption, the docket number (if one has been assigned);
(4) below the caption and docket number, the title of the document and the name of or shortened designation for the party tendering the document.
The title page may extend to additional pages if these required items cannot be set forth on one page. The name, mailing address, telephone number, and, if available, electronic mail address and facsimile transmission number of the person authorized to receive service and other communications on behalf of the party tendering the document must be set forth either on the title page of the document or following the signature at the end of the document (see Rule 1.8). Documents initiating new proceedings must leave a space to the right of the caption for the docket number. (See Rule 18.1.)
(b) Persons and corporations regulated by the Commission must include their assigned Case Information System (CIS) Identification Number in the captions of documents initiating new proceedings and in the titles of other documents filed in existing cases (e.g., "Application of Pacific Bell (U 1001 C) for Rehearing of Decision 91-01-001").
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Section 1701, Public Utilities Code.
(a) Separate documents must be used to ask the Commission or the Administrative Law Judge to take essentially different types of action (e.g., a document entitled "Complaint and Motion for Protective Order" would be improper; the filing must be split up into two separate documents). Motions to accept a late filing that have a pleading attached must indicate in the title that the pleading is attached to the motion (e.g., Motion to Accept Late Comments, Comments Attached).
(b) Except as otherwise required or permitted by these Rules or the Commission's decisions, general orders, or resolutions, prepared testimony shall not be filed or tendered to the Docket Office. If prepared testimony is issued in support of a filing at the time the filing is made, it shall be served (i) on the service list together with the filing, and (ii) on the Administrative Law Judge or, if none is yet assigned, on the Chief Administrative Law Judge.
Note: Authority cited: Section 1701, Public Utilities Code.
(a) A document tendered for filing must have a signature at the end of the document and must state the date of signing, the signer's address, the signer's telephone number, and (if consenting to service by electronic mail) the signer's electronic mail address.
(b) A signature on a document tendered for filing certifies that the signer has read the document and knows its contents; that to the signer's best knowledge, information, and belief, formed after reasonable inquiry, the facts are true as stated; that any legal contentions are warranted by existing law or a good-faith argument for the extension, modification, or reversal of existing law; that the document is not tendered for any improper purpose; and that the signer has full power and authority to sign the document. (See Rule 1.1.)
(c) A document tendered for filing must be signed either by a party or by the attorney or representative of the party. If the document is signed by the party, it must be signed as follows:
(1) If the party is an individual or sole proprietorship, by the individual or proprietor.
(2) If the party is a corporation, trust, or association, by an officer.
(3) If the party is a partnership or limited partnership, by a partner or general partner, respectively.
(4) If the party is a governmental entity, by an officer, agent, or authorized employee.
(d) If a document is tendered for filing on behalf of more than one party, only one party (or one party's attorney or representative) need sign the document unless otherwise required by these rules. The title or first paragraph of the document must identify all parties on whose behalf the document is tendered and state their Case Information System Identification Numbers, if applicable (see Rule 1.6(b)). The signature of a party in these circumstances certifies that the signer has been fully authorized by the indicated parties to sign and tender the document and to make the representations stated in subsection (b) on their behalf.
(e) Except as otherwise required in these rules or applicable statute, either the original signature page or a copy of the original signature page is acceptable for tendering for filing. If a copy of the signature page is tendered, the signer must retain the original, and produce it at the Administrative Law Judge's request, until the Commission's final decision in the proceeding is no longer subject to judicial review.
(f) The Commission may summarily deny a party's request, strike the party's pleadings, or impose other appropriate sanctions for willful violation of subsections (b) or (d) of this rule. The Commission may seek appropriate disciplinary action against an attorney for a willful violation of subsections (b) or (d) of this rule.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Section 1701, Public Utilities Code.
1.9. (Rule 1.9) Service Generally
(a) Except as otherwise provided in these rules or applicable statute, service of a document may be effected by delivering a copy of the document, mailing a copy of the document by first-class mail, or making service by electronic mail (e-mail) as provided in Rule 1.10 to each person whose name is on the official service list or applicable special service list, to the assigned Administrative Law Judge, and to any other person required to be served by statute, by Commission rule or order, or by the Administrative Law Judge. Delivery may be made by handing a copy of the document to the person or leaving it in a place where the person may reasonably be expected to obtain actual and timely receipt. Service by mail is complete when the document is deposited in the mail. Service by e-mail is complete when the e-mail message is transmitted, subject to Rule 1.10(e). The Administrative Law Judge may require more expeditious service or a particular form of service in appropriate circumstances.
(b) In the event that service cannot be completed by any of the methods described in Rule 1.9(a), the Administrative Law Judge may direct or any party may consent to service by other means not listed in Rule 1.9(a) (e.g., facsimile transmission).
(c) A party may serve a Notice of Availability in lieu of all or part of the document to be served:
(1) if the entire document, including attachments, exceeds 50 pages; or
(2) if a document has attachments that are not reproducible in electronic format, or would cause the entire e-mail message, including all attachments, to exceed 3.5 megabytes in size, or would be likely to cause e-mail service to fail for any other reason; or
(3) if the document is made available at a particular Uniform Resource Locator (URL) on the World Wide Web in a readable, downloadable, printable, and searchable format, unless use of such formats is infeasible; or
(4) with the prior permission of the assigned Commissioner or Administrative Law Judge;
except that the document must be served on any party who has previously informed the serving party of its desire to receive the document.
The Notice must comply with Rule 1.6(a), and shall state the document's exact title and summarize its contents, and provide the name, telephone number, and e-mail address, if any, of the person to whom requests for the document should be directed. The document shall be served within one business day after receipt of any such request.
If the document is made available at a particular URL, the Notice of Availability must contain a complete and accurate transcription of the URL or a hyperlink to the URL at which the document is available, and must state the date on which the document was made available at that URL. Such document must be maintained at that URL until the date of the final decision in the proceeding. If changes to the web site change the URL for the document, the serving party must serve and file a notice of the new URL.
(d) A copy of the certificate of service must be attached to each copy of the document (or Notice of Availability) served and to each copy filed with the Commission. If a Notice of Availability is served, a copy of the Notice must also be attached to each copy of the document filed with the Commission. The certificate of service must state: (1) the exact title of the document served, (2) the place, date, and manner of service, and (3) the name of the person making the service. The certificate filed with the original of the document must be signed by the person making the service (see Rule 1.8(e)). The certificate filed with the original of the document must also include a list of the names, addresses, and, where relevant, the e-mail addresses of the persons and entities served and must indicate whether they received the complete document or a Notice of Availability. (See Rule 18.1, Form No. 4.)
(e) The Process Office shall maintain the official service list for each pending proceeding and post the service list on the Commission's web site. It is the responsibility of each person on the service list to provide a current mailing address and, if relevant, current e-mail address, to the Process Office for the official service list. A party may change its mailing address or e-mail address for service or its designation of a person for service by sending a written notice to the Process Office and serving a copy of the notice on each person on the official service list.
(f) The Administrative Law Judge may correct and make minor changes to the official service list and may revise the official service list to delete inactive parties. Before establishing a revised service list, the Administrative Law Judge will give each person on the existing service list notice of the proposed revision and an opportunity to respond to the proposal.
(g) The Administrative Law Judge may establish a special service list that includes some, but not all, persons on the official service list for service of documents related to a portion of a proceeding, provided that all persons on the official service list are afforded the opportunity to be included on the special service list. A special service list may be established, for example, for one phase of a multi-phase proceeding or for documents related to issues that are of interest only to certain parties.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Sections 311.5, 1704, Public Utilities Code.
(a) Electronic mail (e-mail) service may be used in any proceeding which has been assigned a docket number. E-mail service may be made by sending the document, or the Notice of Availability (see Rule 1.9(c)), as an attachment to an
e-mail message to all e-mail addresses shown on the official service list on the date of service. Documents must be in readable, downloadable, printable, and searchable formats, unless use of such formats is infeasible. The subject line of the e-mail message must include in the following order (1) the docket number, (2) a brief name of the proceeding, and (3) a brief identification of the document to be served, including the name of the serving party. The text of the e-mail message must identify the electronic format of the document (e.g., PDF, Excel), whether the e-mail message is one of multiple e-mail messages transmitting the document or documents to be served and, if so, how many e-mails, and the name, telephone number, e-mail address, and facsimile transmission number of the person to whom problems with receipt of the document to be served should be directed. The total size of a single e-mail message and all documents attached to it may not exceed 3.5 megabytes.
(b) By providing an e-mail address for the official service list in a proceeding, a person consents to e-mail service in any proceeding in which the person is on an official service list. A person who has previously provided an e-mail address may withdraw consent to e-mail service in a particular proceeding by serving and filing a notice withdrawing consent to e-mail service for that proceeding. A person who does not consent to receive e-mail service in a proceeding may not use e-mail to serve documents in that proceeding.
(c) By utilizing e-mail service, the serving party agrees, in the event of failure of e-mail service, to re-serve the document, no later than the business day after the business day on which notice of the failure of e-mail service is received by the serving party, by any means authorized by these rules, provided that e-mail service may be used for re-service only if (1) the receiving party consents to the use of e-mail service, or (2) the serving party determines that the cause of the failure of e-mail service has been rectified. "Failure of e-mail service" occurs when the serving party receives notification, in any manner, of non-receipt of an e-mail message, or of the receiving party's inability to open or download an attached document, or of any other inability of the receiving party to access the document to be served. The serving party and receiving party may agree to any form for re-service allowed by these rules. The serving party is not required to re-serve, after failure of e-mail service, any person listed on the official service list for receipt of Commission documents only.
(d) In addition to any other requirements of this rule, the serving party must provide a paper copy of all documents served by e-mail service to the assigned Administrative Law Judge, unless the Administrative Law Judge orders otherwise.
(e) The Commission may serve any document in a proceeding by e-mail service, and/or by making it available at a particular URL, unless doing so would be contrary to state or federal law.
(f) Nothing in this rule alters any of the rules governing filing of documents with the Commission.
(g) The assigned Commissioner or Administrative Law Judge may issue any order consistent with these rules to govern e-mail service in a particular proceeding.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Section 311.5, Public Utilities Code; Section 11104.5, Government Code.
1.11. (Rule 1.11) Verification
(a) Whenever a document is required to be verified by these rules, statute, order, or ruling, the verification must be made either by affidavit sworn or affirmed before a notary public or by declaration under penalty of perjury. When the verification is made by the person who signs the document, the verification must be separately stated and signed.
(b) The verification must be signed (see Rule 1.8(e)) and state that the contents of the document are true of the verifying person's own knowledge, except as to matters that are stated on information or belief, and as to those matters that he or she believes them to be true. (See Rule 18.1.)
(c) If these rules require a party to verify a document, it must be verified as follows (except as provided in subsection (d)):
(1) If the party is an individual or sole proprietorship, by the individual or sole proprietor.
(2) If the party is a corporation, trust, or association, by an officer.
(3) If a party is a partnership or limited partnership, by a partner or general partner, respectively.
(4) If the party is a governmental entity, by an officer, agent, or authorized employee.
(d) A party's attorney or representative may verify a document on behalf of a party if the party is absent from the county where the attorney's or representative's office is located, or if the party for some other reason is unable to verify the document. When a document is verified by the attorney or representative, he or she must set forth in the affidavit or declaration why the verification is not made by the party and must state that he or she has read the document and that he or she is informed and believes, and on that ground alleges, that the matters stated in it are true.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Section 446, Code of Civil Procedure.
1.12. (Rule 1.12) Amendments and Corrections
(a) An amendment is a document that makes a substantive change to a previously filed document. An amendment to an application, protest, complaint, or answer must be filed and served at least five days before the scheduled date of hearing. All amendments thereafter to such documents and to any other documents may be filed only with the permission of the Administrative Law Judge.
(b) The time for filing a reply, response, protest, or answer to an amended document is calculated from the date the amendment is served. Parties who have filed a reply, response, protest or answer to the previously filed document need not file an additional reply, response, protest or answer to the amendment. If the time for filing a reply, response, protest, or answer to the original document has passed, the Administrative Law Judge may limit or prohibit any further reply, response, protest, or answer to the amended document.
(c) Minor typographical or wording corrections that do not alter the substance of a filed document or the relief requested therein are not to be filed.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution.
1.13 (Rule 1.13) Tendering and Review of Document for Filing
(a) Unless otherwise directed, all documents must be tendered for filing at the Commission's Docket Office at the State Building, 505 Van Ness Avenue, San Francisco, California 94102, at the Commission's Offices in the State Building, 320 West 4th Street, Suite 500, Los Angeles, or at the Commission's Offices in the State Building, 1350 Front Street, San Diego.
All documents sent through the mail must be addressed to the Commission's Docket Office in San Francisco. Only hand-delivered documents will be accepted by the Los Angeles or San Diego office. First-class postage charges to San Francisco must be paid at the time documents are tendered to the Los Angeles or San Diego office. Payment of postage charges may be made by check or money order.
A letter transmitting documents to the Docket Office for filing is not required unless acknowledgment of the filing is requested (Rule 1.13(k)).
(b) Except for complaints (see Article 4) and applications for rehearing and their responses (see Rule 16.1), any person tendering a document for filing must submit an original and six exact copies of the document (including any attachments but not including the transmittal letter, if any). After assignment of the proceeding to an Administrative Law Judge, any person tendering a document for filing must submit an original and three copies of the document.
In lieu of the original, one additional copy of the document may be tendered. If a copy is tendered instead of the original, the person tendering the document must retain the original, and produce it at the Administrative Law Judge's request, until the Commission's decision in the proceeding is no longer subject to judicial review.
(c) Tendered documents are not considered filed until they have been reviewed and accepted for filing by the Docket Office in San Francisco.
(d) If a document complies with these rules and is accepted for filing by the Docket Office in San Francisco, the filing will be recorded as of the date it was first tendered for filing at the Commission's San Francisco, Los Angeles, or San Diego office.
(e) Any tendered document that does not comply with applicable rules, Commission orders, or statutes may be rejected. Rejected documents will be returned with a statement of the reasons for the rejection. Documents submitted in response to a rejected document will not be filed.
(f) If a tendered document does not comply with applicable requirements, the Docket Office, with the consent of the person tendering the document, may retitle the document or strike part of the document, and the document as modified may be accepted for filing. The person tendering the document must notify all persons served with the document of the modification or striking.
(g) If a tendered document does not comply with applicable requirements, the person tendering the document may, in the body of the document, request waiver of the requirements to which the document does not conform. The request must state the reasons justifying the waiver. The assigned Administrative Law Judge will decide whether or not to waive the requirements as requested. If the waiver is granted, the document will be filed as of the date it was tendered for filing.
(h) If a tendered document is in substantial, but not complete, compliance with Rules 1.5 through 1.12, the Docket Office may notify the person tendering the document of the defect. If the defect is cured within seven days of the date of this notification, the document will be filed as of the date it was tendered for filing, provided that the document was properly served as required by these rules on or before the date the document was tendered for filing.
(i) Acceptance of a document for filing is not a final determination that the document complies with all requirements of the Commission and is not a waiver of such requirements. The Commission, the Executive Director, or the Administrative Law Judge may require amendments to a document, and the Commission or the Administrative Law Judge may entertain appropriate motions concerning the document's deficiencies.
(j) If a document initiates a new proceeding, the proceeding will be assigned a docket number when the document is accepted for filing. The Chief Administrative Law Judge shall maintain a docket of all proceedings.
(k) The Docket Office will provide an acknowledgment of the filing of any document on request, provided the person tendering the document furnishes, at the time the document is tendered, an extra copy of a letter of transmittal or of the document and a self-addressed envelope with postage fully prepaid. The extra copy of the letter of transmittal or of the document will be stamped with the filing stamp and docket number and returned by mail.
(l) Specific types of documents may be subject to additional requirements stated in other articles of these rules. Additional or different requirements for certain types of filings are stated in the Public Utilities Code or in the Commission's decisions, General Orders, or resolutions.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution.
1.14. (Rule 1.14) Computation of Time
When a statute or Commission decision, rule, order, or ruling sets a time limit for performance of an act, the time is computed by excluding the first day (i.e., the day of the act or event from which the designated time begins to run) and including the last day. If the last day falls on a Saturday, Sunday, holiday or other day when the Commission offices are closed, the time limit is extended to include the first day thereafter.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Section 12, Code of Civil Procedure.
Filing fees required by the Public Utilities Code are set forth in the Table of Filing Fees at the end of the Rules. If the fee in the table conflicts with the fee stated in the appropriate statute, the statute prevails. Filings marked with an asterisk should be submitted to the Tariff and License Branch of the Rail Safety and Carriers Division.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Sections 1001, 1007, 1008, 1036, 1904, 2754, 2756, 3902, 4006, 5136, 5371.1, 5373.1 and 5377.1, Public Utilities Code.
1.16. (Rule 1.16) Daily Calendar
A Daily Calendar of newly filed proceedings, proceedings set for hearings, submission of proceedings and newly filed recommended decisions shall be available for public inspection at the Commission's San Francisco and Los Angeles offices. The Daily Calendar shall indicate the time and place of the next three regularly scheduled Commission meetings. Electronic access to the Daily Calendar is available at the Commission's website ( www.cpuc.ca.gov).
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution.
All applications shall state clearly and concisely the authorization or relief sought; shall cite by appropriate reference the statutory provision or other authority under which Commission authorization or relief is sought; shall be verified by at least one applicant (see Rule 1.11); and, in addition to specific requirements for particular types of applications, shall state the following:
(a) The exact legal name of each applicant and the location of principal place of business, and if an applicant is a corporation, trust, association, or other organized group, the State under the laws of which such applicant was created or organized.
(b) The name, title, address, telephone number, facsimile transmission number, and, if the applicant consents to e-mail service, the e-mail address, of the person to whom correspondence or communications in regard to the application are to be addressed. Notices, orders and other papers may be served upon the person so named, and such service shall be deemed to be service upon applicant.
(c) The proposed category for the proceeding, the need for hearing, the issues to be considered, and a proposed schedule. (See Article 7.) The proposed schedule
shall be consistent with the proposed category, including a deadline for resolving the proceeding within 12 months or less (adjudicatory proceeding) or 18 months or less (ratesetting or quasi-legislative proceeding).
(d) Such additional information as may be required by the Commission in a particular proceeding.
Note: Authority cited: Section 1701, Public Utilities Code.
All applicants other than natural persons shall submit with their applications a copy of the entity's organizing documents and evidence of the applicant's qualification to transact business in California. If current documentation has previously been filed with the Commission, the application need only make specific reference to such filing.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 167 and 15010.5, Corporations Code.
Wherever these rules provide that a financial statement shall be attached to the application, such statement, unless otherwise provided herein, shall be prepared as of the latest available date, and shall show the following information:
(a) Amount and kinds of stock authorized by articles of incorporation and amount outstanding.
(b) Terms of preference of preferred stock, whether cumulative or participating, or on dividends or assets, or otherwise.
(c) Brief description of each security agreement, mortgage and deed of trust upon applicant's property, showing date of execution, debtor and secured party, mortgagor and mortgagee and trustor and beneficiary, amount of indebtedness authorized to be secured thereby, and amount of indebtedness actually secured, together with any sinking fund provisions.
(d) Amount of bonds authorized and issued, giving name of the public utility which issued same, describing each class separately, and giving date of issue, par value, rate of interest, date of maturity and how secured, together with amount of interest paid thereon during the last fiscal year.
(e) Each note outstanding, giving date of issue, amount, date of maturity, rate of interest, in whose favor, together with amount of interest paid thereon during the last fiscal year.
(f) Other indebtedness, giving same by classes and describing security, if any, with a brief statement of the devolution or assumption of any portion of such indebtedness upon or by any person or corporation if the original liability has been transferred, together with amount of interest paid thereon during the last fiscal year.
(g) Rate and amount of dividends paid during the five previous fiscal years, and the amount of capital stock on which dividends were paid each year.
(h) A balance sheet as of the latest available date, together with an income statement covering period from close of last year for which an annual report has been filed with the Commission to the date of the balance sheet attached to the application.
Note: Authority cited: Section 1701, Public Utilities Code.
(a) Applications for authority to undertake any projects that are subject to the California Environmental Quality Act of 1970, Public Resources Code Sections 21000 et seq. (CEQA) and the guidelines for implementation of CEQA, California Administrative Code Sections 15000 et seq., shall be consistent with these codes and this rule.
(b) Any application for authority to undertake a project that is not statutorily or categorically exempt from CEQA requirements shall include a Proponent's Environmental Assessment (PEA). The PEA shall include all information and studies required under the Commission's Information and Criteria List adopted pursuant to Chapter 1200 of the Statutes of 1977 (Government Code Sections 65940 through 65942), which is published on the Commission's Internet website.
(c) Any application for authority to undertake a project that is statutorily or categorically exempt from CEQA requirements shall so state, with citation to the relevant authority.
Note: Authority cited: Section 1701, Public Utilities Code.
(a) For any project where the Commission is the lead agency responsible for preparing the Environmental Impact Report (EIR) or Negative Declaration the proponent shall be charged a fee to recover the Commission's actual cost of preparing the EIR or Negative Declaration. A deposit shall be charged the proponent as set forth below:
A deposit of thirty dollars ($30) for each one thousand dollars ($1,000) of the estimated capital cost of the project up to one hundred thousand dollars ($100,000), ten dollars ($10) for each one thousand dollars ($1,000) over one hundred thousand dollars ($100,000) and up to one million dollars ($1,000,000), five dollars ($5) for each one thousand dollars ($1,000) over one million dollars ($1,000,000) and up to five million dollars ($5,000,000), two dollars ($2) for each one thousand dollars ($1,000) over five million dollars ($5,000,000) and up to ten million dollars ($10,000,000), one dollar ($1) for each one thousand dollars ($1,000) over ten million dollars ($10,000,000) and up to one hundred million dollars ($100,000,000), and fifty cents ($0.50) for each one thousand dollars ($1,000) over one hundred million dollars ($100,000,000). A minimum deposit of five hundred dollars ($500) shall be charged for projects with an estimated capital cost of sixteen thousand dollars ($16,000) or less.
If a project lacks a capital cost basis, the Commission, assigned Commissioner, or Administrative Law Judge shall determine, as early as possible, the deposit to be charged.
(b) The deposit shall be collected whenever an EIR or Negative Declaration is requested or required. The costs of preparing the EIR or Negative Declaration shall be paid from such deposits.
(c) Proponent shall pay the applicable deposit in progressive payments due as follows: One-third of the deposit at the time the application or pleading is filed, an additional one-third no later than 120 days after the time the application or pleading is filed, and the remaining one-third no later than 180 days after the time the application or pleading is filed. Failure to remit full payment of the deposit no later than 180 days after the time the application or pleading is filed may subject the proponent to a fine not exceeding 10 percent of the outstanding amount due. If the costs exceed such deposit the proponent shall pay for such excess costs within 20 days of the date stated on the Commission's bill for any excess costs. If the costs are less than the deposit paid by the proponent, the excess shall be refunded to the proponent.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Section 21165, Public Resources Code.
2.6. (Rule 2.6) Protests, Responses, and Replies
(a) Unless otherwise provided by rule, decision, or General Order, a protest or response must be filed within 30 days of the date the notice of the filing of the application first appears in the Daily Calendar, and shall be concurrently served on the applicant and each person listed in the application as being authorized to receive service.
(b) A protest objecting to the granting, in whole or in part, of the authority sought in an application must state the facts constituting the grounds for the protest, the effect of the application on the protestant, and the reasons the protestant believes the application, or a part of it, is not justified. If the protest requests an evidentiary hearing, the protest must state the facts the protestant would present at an evidentiary hearing to support its request for whole or partial denial of the application.
(c) Any person may file a response that does not object to the authority sought in an application, but nevertheless presents information that the person tendering the response believes would be useful to the Commission in acting on the application.
(d) Any person protesting or responding to an application shall state in the protest or response any comments or objections regarding the applicant's statement on the proposed category, need for hearing, issues to be considered, and proposed schedule. Any alternative proposed schedule shall be consistent with the proposed category, including a deadline for resolving the proceeding within 12 months or less (adjudicatory proceeding) or 18 months or less (ratesetting or quasi-legislative proceeding).
(e) An applicant may file replies to protests and responses within 10 days of the last day for filing protests and responses, unless the Administrative Law Judge
sets a different date. Replies must be served on all protestants, all parties tendering responses, and the assigned Administrative Law Judge.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution.
Applicants, protestants, and parties tendering responses must promptly furnish a copy of their applications, protests, or responses to each person requesting one.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution.
3.1. (Rule 3.1) Construction or Extension of Facilities
Applications, under Section 1001 of the Public Utilities Code, to construct or extend facilities shall contain the following information:
(a) A full description of the proposed construction or extension, and the manner in which the same will be constructed.
(b) The names and addresses of all utilities, corporations, persons or other entities, whether publicly or privately operated, with which the proposed construction is likely to compete, and of the cities or counties within which service will be rendered in the exercise of the requested certificate. Whenever a public utility applies to the Commission to extend or establish its water service within a county water district, a public utility or municipal utility district, or other water or utility district, or any area served by such district, such district shall also be named, if it furnishes a like service. The application shall contain a certification that a copy of the application has been served upon or mailed to each such person named.
(c) A map of suitable scale showing the location or route of the proposed construction or extension, and its relation to other public utilities, corporations, persons, or entities with which the same is likely to compete.
(d) A statement identifying the franchises and such health and safety permits as the appropriate public authorities have required or may require for the proposed construction or extension.
(e) Facts showing that public convenience and necessity require, or will require, the proposed construction or extension, and its operation.
(f) A statement detailing the estimated cost of the proposed construction or extension and the estimated annual costs, both fixed and operating associated therewith. In the case of a utility which has not yet commenced service or which has been rendering service for less than twelve months, the applicant shall file as a part of the application supporting statements or exhibits showing that the proposed construction is in the public interest and whether it is economically feasible.
(g) Statements or exhibits showing the financial ability of the applicant to render the proposed service together with information regarding the manner in which applicant proposes to finance the cost of the proposed construction or extension.
(h) A statement of the proposed rates to be charged for service to be rendered by means of such construction or extension. If the application proposes any increase in rates, it shall comply with Rule 3.2(a).
(i) A statement corresponding to the statement required by Section 2 of General Order No. 104-A, as to all known matters which both (a) are designated by said section for inclusion in the annual report but occurred or were proposed subsequent to the period covered by the last previous annual report filed by the applicant and (b) are, or will be, connected with the construction or extension proposed in the application; or, if no such matters are known to have so occurred or are then known to be proposed, a statement to that effect; provided, that an applicant whose capital stock, or that of its parent company, is listed on a "national securities exchange," as defined in the Securities Exchange Act of 1934 (15 U.S.C. 78(a) et seq.), in lieu of the statement required by this rule shall include in the application a copy of the latest proxy statement sent to stockholders by it or its parent company if not previously filed with the Commission, provided, further, that an applicant whose capital stock, or that of its parent company, is registered with the Securities and Exchange Commission (SEC) pursuant to the provisions of Section 12(g) of said Securities Exchange Act of 1934, in lieu of the statement required by this rule shall include in the application a copy of the latest proxy statement sent to stockholders by it or its parent company containing the information required by the rules of the SEC if not previously filed with the Commission.
(j) In the case of a telephone utility, the estimated number of customers and their requirements for the first and fifth years in the future.
(k) In the case of a gas utility seeking authority to construct a pipeline:
(1) Regarding the volumes of gas to be transported:
(A) A statement of the volumes to be transported via the proposed
pipeline including information on the quality of gas and the maximum daily and annual average daily delivery rates.
(B) A statement that copies of summaries of all contracts for delivery and
receipt of gas to be transported via the proposed pipeline and information on the reserves and delivery life pertaining thereto will be made available for inspection on a confidential basis by the Commission or any authorized employee thereof. The terms and provisions of individual contracts for gas supply and data as to reserves or delivery life of individual gas suppliers shall not be required to be stated in the application or in the record of the proceedings, and if disclosed to the commission or to any officer or employee of the Commission on a confidential bases as herein provided, shall not be made public or be open to public inspection.
(2) A summary of the economic feasibility, the market requirements and other information showing the need for the new pipeline and supply.
(3) Where the gas to be transported through the pipeline is to be purchased
by the applicant from, or transported by the applicant for, an out-of-state supplier:
(A) A copy of the proposed tariff under which the gas will be purchased
or transported.
(B) A statement that the out-of-state pipeline supplier has agreed: (1) to file with this Commission copies of annual reports which it files with the Federal Power Commission; (2) to file with this Commission monthly statements of its revenues, expenses and rate base components; (3) to file with this Commission copies of its tariffs as filed from time to time with the Federal Power Commission; and (4) at all times to permit this Commission or its staff reasonable opportunity for field inspection of facilities and examination of books and records, plus assurance that reasonable requests for operating information otherwise prepared in the course of business will be supplied in connection with any proceeding before the Federal Power Commission.
(l) In the case of an electric utility proposing to construct an electric generating plant:
(1) Load and resource data setting forth recorded and estimated loads (energy and demands), available capacity and energy, and margins for two years actual and three years estimated, on an average year basis.
(2) Existing rated and effective operating capacity of generating plants and the planned additions for a three-year period.
(3) Estimated capital and operating costs of power to be generated by the proposed plant for all competitive fuels which may be used under legislative restrictions in the proposed plant.
(4) For any nuclear plant, a statement indicating that the requisite safety and other license approvals have been obtained or will be applied for, and that a copy of the application to this Commission has been furnished to the State Coordinator of Atomic Energy Development and Radiation Protection.
(m) In the case of a water utility:
(1) An estimate of the number of customers and the requirements for water for the first and fifth years in the future, and the ultimate future development anticipated by applicant, together with a description of the proposed normal, and emergency standby, water facilities for production, storage and pressure to serve the area for which the certificate is sought.
(2) A statement of the estimated operating revenues and estimated expenses, by major classes, including taxes and depreciation, for the first and fifth years in the future attributable to operations in the proposed area.
(3) If the applicant has operated as a water utility elsewhere in the State of California for a period in excess of one year prior to filing the application, a general statement of the operating plans for the proposed area, including a statement whether a new area will be served by existing personnel or will constitute a separate district to be served by new personnel. If the applicant has not operated as a water utility elsewhere in the State of California for a period in excess of one year prior to filing the application, a description of the operating plans for the proposed area, including, to the extent available, but not necessarily limited to, such items as qualifications of management and operating personnel, proposed operating pressures for the system, plans for water treatment, availability of utility personnel to customers, billing procedures, emergency operation plans and provision for handling customer complaints.
(n) In the case of an application by a water utility in an area in which the facilities have already been constructed, extended or installed:
(1) A detailed statement of the amount and basis of the original cost (estimated if not known) of all plant and of the depreciation reserve applicable thereto.
(2) If the facilities have been rendering service in the area for which the certificate is sought, and
(A) The rates proposed are the same as the tariff rates in the district which
includes the area to be certificated, the application shall also include a summary of earnings on a depreciated rate base with respect to such area for the test period or periods upon which applicant bases its justification for the rates to be applied in such area; otherwise
(B) The application shall also comply with Rule 3.2(a), including the furnishing of the information specified in subsections (5) and (6) thereof but made applicable to the proposed rates; provided, however, the information required by subsections (2) and (3) thereof need be furnished only when increases are proposed.
(o) Such additional information and data as may be necessary to a full understanding of the situation.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Section 1001, Public Utilities Code.
3.2. (Rule 3.2) Authority to Increase Rates
(a) Applications for authority to increase rates, or to implement changes that would result in increased rates, shall contain the following data, either in the body of the application or as exhibits annexed thereto or accompanying the application:
(1) A balance sheet as of the latest available date, together with an income statement covering period from close of last year for which an annual report has been filed with the Commission to the date of the balance sheet attached to the application.
(2) A statement of the presently effective rates, fares, tolls, rentals, or charges which are proposed to be increased, or of the classification, contract, practice, or rule proposed to be altered. Such statement need not be in tariff form.
(3) A statement of the proposed increases or changes which will result in increases, which applicant requests authority to make effective. Such statement need not be in tariff form, but shall set forth the proposed rate structure with reasonable clarity. Except as to carriers, the statement shall also show the amount of proposed gross revenues, together with the percentage of increase, if in excess of one percent, estimated to result from the proposed rates. In the case of common carriers, where a general rate increase application is filed, the statement shall include an estimate of the amount of additional annual gross revenue estimated to result from the increase, which shall be based on the amount of involved traffic handled for the preceding calendar year and shall indicate the percentage by which such estimate exceeds the gross revenues on the involved traffic for the preceding calendar year, if more than one percent. In the case of gas, electric, telephone, telegraph, water and heat utilities, the proposed revenue increase, including the percentage of increase, if in excess of one percent, shall be shown by appropriate rate classifications. If the percentage of increase in revenue is one percent or less, applicant shall so state in its application.
(4) A general rate increase application shall contain a general description of applicant's property and equipment, or reference to such description in a recent prior application, and a statement of the original cost thereof, together with a statement of the depreciation reserve applicable thereto. If it is impossible to state original cost, the facts creating such impossibility shall be set forth.
(5) A summary of earnings (rate of return summary) on a depreciated rate base for the test period or periods upon which applicant bases its justification for an increase. If adjusted or estimated results are shown for successive periods, they should be on a consistent basis. Wherever adjusted results are shown, the recorded results for the same periods should also be shown.
(6) In rate applications involving a utility having more than one department, district or exchange, the earnings results should be presented for the total utility operations for the company, as well as for the part of the operation for which rate increases are sought.
(7) The application of a gas, electric, telephone, telegraph, water or heat utility for a general rate increase shall contain a statement by the applicant as to which of the optional methods provided in the Internal Revenue Code applicant has elected to employ in computing the depreciation deduction for the purpose of determining its federal income tax payments, and whether applicant has used the same method or methods in calculating federal income taxes for the test period for rate fixing purposes.
(8) The application of a gas, electric, telephone, telegraph, water or heat utility for a general rate increase shall contain a statement corresponding to the statement required by Section 2 of General Order No. 104-A, as to all known matters designated by said section for inclusion in the annual report but occurring or proposed subsequent to the period covered by the last annual report filed by applicant; or, if no such matters are known to have so occurred or are known to be then proposed, a statement to that effect; provided, that an applicant whose capital stock, or that of its parent company, is listed on a "national securities exchange," as defined in the Securities Exchange Act of 1934 (15 U.S.C. 78(a) et seq.) in lieu of the statement required by this rule shall include in the application a copy of the latest proxy statement sent to stockholders by it or its parent company if not previously filed with the Commission, provided, further, that an applicant whose capital stock, or that of its parent company, is registered with the Securities and Exchange Commission (SEC) pursuant to the provisions of Section 12(g) of said Securities Exchange Act of 1934, in lieu of the statement required by this rule shall include in the application a copy of the latest proxy statement sent to stockholders by it or its parent company containing the information required by the rules of the SEC if not previously filed with the Commission.
(9) In a general rate increase application involving a telephone utility having an annual operating revenue exceeding $25,000, the rate of return on a depreciated rate base shall be shown separately for its aggregate exchange operations, for its toll operations, and for the total telephone utility operations of applicant.
(10) The application of electrical, gas, heat, telephone, water, or sewer system corporations shall separately state whether or not the increase reflects and passes through to customers only increased costs to the corporation for the services or commodities furnished by it.
(b) Applicants for authority to increase rates shall, within 10 days after filing the application with the Commission, mail a notice to the following stating in general terms the proposed increases in rates or fares: (1) the State, by mailing to the Attorney General and the Department of General Services, when the State is a customer or subscriber whose rates or fares would be affected by the proposed increase; (2) each county, by mailing to the County Counsel (or District Attorney if the county has no County Counsel) and County Clerk, and each city, by mailing to the City Attorney and City Clerk, listed in the current Roster published by the Secretary of State in which the proposed increase is to be made effective; and (3) any other persons whom applicant deems appropriate or as may be required by the Commission.
(c) Gas, electric, telephone, telegraph, water or heat utilities, within ten days after the filing of the application, shall publish at least once in a newspaper of general circulation in the county in which the increases are proposed to be made effective a notice, in general terms, of the proposed increases in rates. Such notice shall state that a copy of said application and related exhibits may be examined at the offices of the California Public Utilities Commission in San Francisco or Los Angeles and in such offices of the applicant as are specified in the notice, and shall state the locations of such offices. Applicants shall file proof of compliance within 10 days after publication.
(d) Electric, gas, heat, telephone, water, or sewer system corporations, within 45 days, if the corporation operates on a 30-day billing cycle, or within 75 days, if the corporation operates on a 60-day or longer billing cycle, after the filing of an application to increase any rate of charge, other than a change reflecting and passing through to customers only new costs to the corporation which do not result in changes in revenue allocation, for the services or commodities furnished by it, shall furnish to its customers affected by the proposed increase notice of its application either by mailing such notice postage prepaid to such customers or by including such notice with the regular bill for charges transmitted to such customers. The notice shall state the amount of the proposed rate change expressed in both dollar and percentage terms for the entire rate change as well as for each customer classification, a brief statement of the reasons the change is required or sought, and the mailing, and if available, the e-mail, address of the commission to which any customer inquiries may be directed regarding how to participate in, or receive further notices regarding the date, time, and place of any hearing on the application, and the mailing address of the corporation to which any customer inquiries may be directed. Applicants shall file proof of compliance within 10 days after mailing.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Section 454, Public Utilities Code.
3.3. (Rule 3.3) Certificate to Operate
(a) Applications for a certificate to operate as a vessel common carrier or passenger stage corporation shall contain the following information:
(1) The type of service being performed by applicant, a general description of it, and a reference to the authority under which existing service is performed.
(2) The specific authority requested and the particular statutory provision under which the certificate is requested.
(3) If a carrier of property, a description of specified commodities proposed to be transported, and, if general commodities with exceptions are proposed to be transported, a statement specifying such exceptions.
(4) The geographical scope of the proposed operation, including the termini and other points proposed to be served, and a concise narrative description of the proposed route.
(5) A map or sketch of the route and points to be served, drawn to suitable indicated scale, and showing present and proposed operation by distinctive coloring or marking.
(6) A statement of the rates or fares proposed to be charged and rules governing service. Applications for certificates need not contain tariffs, but shall indicate the level and nature of proposed rates and rules and may refer to tariffs on file with or issued by the Commission.
(7) A statement indicating the frequency of the proposed service. If "on call" service is proposed, the application shall set forth conditions under which such service would be performed.
(8) The kind and approximate number of units of equipment to be employed in the proposed service.
(9) A statement of financial ability to render the proposed service.
(10) Facts showing that the proposed operation is required by public convenience and necessity.
(b) Every applicant for a passenger stage certificate shall forward a copy of the application to each public transit operator operating in any portion of the territory sought to be served by the applicant. The applicant shall also mail a notice that the application has been filed with the Commission to all city and county governmental entities and regional transportation planning agencies within whose boundaries passengers will be loaded or unloaded. This notice shall state in general terms the authority sought, including the proposed routes, schedules, fares and equipment. Said notice shall also state that a copy of the application and related exhibits will be furnished by applicant upon written request. A copy of the notice and a certificate of service shall be filed with the application.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Sections 701, 1007, 1032, and 1701, Public Utilities Code.
3.4. (Rule 3.4) Abandon Passenger Stage Service
Applications for authority to abandon passenger stage service, or reduce service to less than one trip per day (excluding Saturday and Sunday), shall include the following information:
NOTE: If more than one point, route, or route segment is included in the application, the indicated data are to be separately stated for each point, route, or route segment.
(a) A listing of points, routes, and route segments to be abandoned, including identification and a brief description of any other passenger transportation service available at the points or along the routes affected.
(b) Maps to scale showing each point, route, and route segment to be abandoned.
(c) Current and proposed timetables covering the affected points and routes.
(d) Current and proposed certificate authorities covering the affected points and routes.
(e) Traffic data for a recent representative period, showing numbers of interstate and intrastate passengers (by classification if more than one type of ticket is sold) destined to and originating from each point to be abandoned; also package express shipments similarly stated.
(f) Description of the fares and rates applicable to the affected services.
(g) Calculation of the annual interstate and intrastate passenger, express, and other revenues which accrue as a result of the service to be abandoned, along with an explanation of how the revenues were calculated and of any assumptions underlying the calculations.
(h) Calculations of route miles, annual bus miles, and schedule operating time to be eliminated for each point, route, or route segment to be abandoned.
(i) Calculation in the Uniform System of Accounts for Common and Contract Motor Carriers of Passengers, of the variable costs of operating each affected service, with an explanation of how the costs were calculated, and of any assumptions underlying the calculations (assumptions should be consistent with those used to calculate revenues). Any labor costs included shall also be separately identified and described.
(j) Description of any present operating subsidies or financial assistance applicable to the affected service, including identification of source, amounts, duration, and any significant terms or conditions applicable; also description of any proposals or discussions with respect to operating subsidies or financial assistance which have occurred during the year preceding the filing of the application.
(k) Any additional evidence or legal argument applicant believes to be relevant to the application.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 454, 818, 851, 852, and 1031, Public Utilities Code.
3.5. (Rule 3.5) Debt and Equity
Applications to issue stock or evidences of indebtedness, or to assume liabilities, under Sections 816 through 830 of the Public Utilities Code shall contain the following information:
(a) A general description of applicant's property and its field of operation, the original cost of its property and equipment, individually or by class, and the cost thereof to applicant and the depreciation and amortization reserves applicable to such property and equipment, individually or by class. If it is impossible to state original cost, the facts creating such impossibility shall be stated.
(b) The amount and kind of stock, or other evidence of interest or ownership, which applicant desires to issue, and, if preferred, the nature and extent of the preference; the amount of bonds, notes or other evidences of indebtedness which applicant desires to issue, with terms, rate of interest, and whether and how to be secured; the amount and description of the indebtedness which applicant desires to assume.
(c) The purposes for which the securities are to be issued:
(1) If for property acquisition, a detailed description thereof, the consideration to be paid therefore, and the method of arriving at the amount.
(2) If for construction, completion, extension or improvement of facilities, a description thereof in reasonable detail, the cost or estimated cost thereof, and the reason or necessity for the expenditures.
(3) If for improvement of service, a statement of the character of the improvements proposed, or if for maintenance of service, a statement of the reasons why service should be maintained from capital.
(4) If for discharge or refunding of obligations, a full description of the obligations to be discharged or refunded, including the character, principal amount, discount or premium applicable thereto, date of incurrence, date of maturity, rate of interest, and other material facts concerning such obligations, together with a statement showing the purposes for which such obligations had been incurred, or the proceeds expended, and the Commission's decisions, if any, authorizing the incurrence of such obligations.
(5) If for the financing of the acquisition and installation of electrical and plumbing appliances and agricultural equipment which are sold by other than a public utility, for use within the service area of the public utility, a statement of the reason or necessity for such financing.
(6) If for reorganization or readjustment of indebtedness or capitalization, or for retirement or exchange of securities, a full description of the indebtedness or capitalization to be readjusted or exchanged; complete terms and conditions of the merger, consolidation, exchange or other reorganization; a pro forma balance sheet, if possible, giving effect to such reorganization, readjustment or exchange; and a statement of the reason or necessity for the transaction.
(7) If for reimbursement of moneys actually expended from income, or from any other moneys in the treasury, a general description of the expenditures for which reimbursement is sought, the source of such expenditures, the periods during which such expenditures were made, and the reason or necessity for such reimbursement.
(d) A complete description of the obligation or liability to be assumed by applicant as guarantor, endorser, surety or otherwise, the consideration to be received by applicant, and the reason or necessity for such action.
(e) A statement corresponding to the statement required by Section 2 of General Order No. 104-A, as to all known matters designated by said section for inclusion in the annual report but occurring or proposed subsequent to the period covered by the last annual report filed by applicant; or if no such matters are known to have so occurred or are then known to be proposed, a statement to that effect; provided, that an applicant whose capital stock, or that of its parent company, is listed on a "national securities exchange," as defined in the Securities Exchange Act of 1934 (15 U.S.C. 78(a) et seq.), in lieu of the statement required by this rule shall include in the application a copy of the latest proxy statement sent to stockholders by it or its parent company if not previously filed with the Commission, provided, further, that an applicant whose capital stock, or that of its parent company, is registered with the Securities and Exchange Commission (SEC) pursuant to the provisions of Section 12(g) of said Securities Exchange Act of 1934, in lieu of the statement required by this rule shall include in the application a copy of the latest proxy statement sent to stockholders by it or its parent company containing the information required by the rules of the SEC if not previously filed with the Commission.
(f) Copy of deeds of trust, security agreements, mortgages, conditional sales contracts, notes or other instruments (excluding stock certificates) defining the terms of the proposed securities. If the same have already been filed, the application need only make specific reference to such filings.
(g) Copy of each plan, offer or agreement for the reorganization or readjustment of indebtedness or capitalization or for the retirement or exchange of securities.
Note: Authority cited: Section 1701, Public Utilities Code; and Article 12, Section 2, California Constitution. Reference: Section 829, Public Utilities Code.
3.6. (Rule 3.6) Transfers and Acquisitions
Applications to sell, lease or encumber utility property rights, to merge or consolidate facilities, to acquire stock of another utility, or to acquire or control a utility under Sections 851 through 854 of the Public Utilities Code shall be signed by all parties to the proposed transaction, except the lender, vendor under a conditional sales contract, or trustee under a deed of trust, unless such party is a public utility. In addition, they shall contain the following information:
(a) The character of business performed and the territory served by each applicant.
(b) A description of the property involved in the transaction, including any franchises, permits, or operative rights; and, if the transaction is a sale, lease, assignment, merger or consolidation, a statement of the book cost and the original cost, if known, of the property involved.
(c) Detailed reasons upon the part of each applicant for entering into the proposed transaction, and all facts warranting the same.
(d) The agreed purchase price and the terms for payment. If a merger or consolidation, the full terms and conditions thereof.
(e) In consolidation and merger proceedings, a financial statement as outlined in Rule 2.3. In other transfer proceedings, a balance sheet as of the latest available date, together with an income statement covering period from close of last year for which an annual report has been filed with the Commission to the date of the balance sheet attached to the application.
(f) Copy of proposed deed, bill of sale, lease, security agreement, mortgage, or other encumbrance document, and contract or agreement therefore, if any, and copy of each plan or agreement for purchase, merger or consolidation.
(g) If a merger or consolidation, a pro forma balance sheet giving effect thereto.
(h) Applications that involve a certificate or operative right as vessel common carrier or passenger stage corporation shall also state, as to the seller, whether it is a party to any through routes or joint rates or fares with any other carrier, and whether operation under the rights involved is presently being conducted. If there has been any suspension or discontinuance of service during the preceding three years, the application shall state those facts and circumstances.
Note: Authority cited: Article 12, Section 2, California Constitution; and Section 1701, Public Utilities Code. Reference: Sections 1007, 1010, and 1032.
3.7. (Rule 3.7) Public Road Across Railroad
Applications to construct a public road, highway, or street across a railroad must be made by the municipal, county, state, or other governmental authority which proposes the construction. Such applications shall be served on the affected railroad corporations, and shall contain the following information:
(a) The rail milepost and either a legal description of the location of the proposed crossing or a location description using a coordinate system that has accuracy comparable to a legal description.
(b) Crossing identification numbers of the nearest existing public crossing on each side of the proposed crossing. (Numbers may be obtained from the crossing sign at the crossing, or from the office of the railroad.)
(c) If the proposed crossing is at-grade, (1) a statement showing the public need to be served by the proposed crossing; (2) a statement showing why a separation of grades is not practicable; and (3) a statement showing the signs, signals, or other crossing warning devices which applicant recommends be provided at the proposed crossing.
(d) A map of suitable scale (50 to 200 feet per inch) showing accurate locations of all streets, roads, property lines, tracks, buildings, structures or other obstructions to view for a distance of at least 400 feet along the railroad and 200 feet along the highway in each direction from the proposed crossing. Such map shall show the character of surface or pavement and width of same, either existing or proposed, on the street or road adjacent to the proposed crossing and on each side thereof. If the proposed crossing is grade-separated, the map shall also show the vertical and horizontal clearances from the tracks to bridge structures.
(e) A map of suitable scale (1,000 to 3,000 feet per inch) showing the relation of the proposed crossing to existing roads and railroads in the general vicinity of the proposed crossing.
(f) A profile showing the ground line and grade line and rate of grades of approach on all highways and railroads affected by the proposed crossing.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 1201, 1201.1, 1202, Public Utilities Code.
3.8. (Rule 3.8) Alter or Relocate Existing Railroad Crossing
An application to alter or relocate an existing railroad crossing shall comply with the requirements of Rule 3.7, except that it shall state the crossing identification number of the affected crossing, instead of the nearest crossings, and shall state if the affected crossing will remain within the existing right-of-way.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 1201, 1201.1, 1202, Public Utilities Code.
3.9. (Rule 3.9) Railroad Across Public Road
An application to construct a railroad across a public road, highway or street shall be served on the municipal, county, state or other governmental authority having jurisdiction and control over the highway or charged with its construction and maintenance, and shall include, in addition to the information required by Rule 3.7, the following information:
(a) A copy of the franchise or permit, if any be requisite, from the authority having jurisdiction, which allows the railroad to cross the public road, highway or street involved. If such franchise or permit has already been filed, the application need only make specific reference to such filing.
(b) The proposed crossing identification number.
(c) The map referred to in Rule 3.7(d) shall also show, by distinct colorings or lines, all new tracks or changes in existing tracks, within the limits of the drawing, which are to be made in connection with the construction of the proposed crossing.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 1201, 1201.1, 1202, Public Utilities Code.
Applications to construct a railroad or street railroad across a railroad or street railroad shall be served on the affected railroad or street corporations, and shall contain the following information:
(a) The rail milepost and either a legal description of the location of the proposed crossing or a location description using a coordinate system that has accuracy comparable to a legal description.
(b) A map of suitable scale (50 to 200 feet per inch) showing accurate locations of all streets, roads, property lines, tracks, buildings, structures or other obstructions to view in the immediate vicinity.
(c) A map of suitable scale (1,000 to 3,000 feet per inch) showing the relation of the proposed crossing to existing railroads in the general vicinity.
(d) A profile showing the ground line and grade line of approaches on all railroads affected.
(e) A true copy of the contract executed by the parties, or other evidence that the carrier to be crossed is willing that the crossing be installed.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 1201, 1201.1, 1202, Public Utilities Code.
Applications to construct crossings or intersections of a light-rail transit system and a public road, street, highway or railroad pursuant to General Order 143-B, Section 9.08, shall comply with the appropriate requirements of Rules 3.7 through 3.10.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 778 and 99152, Public Utilities Code.
3.12. (Rule 3.12) Exemption from Undergrounding Rules
Applications for exemption from the rules in Decision 80864 (74 CPUC 454) for undergrounding electric and telephone lines shall include the following information:
(a) A statement of facts justifying exemption from undergrounding rules.
(b) The name of the development or subdivision, if any.
(c) A map showing the location of the project and any related development or subdivision.
(d) A legal description, as recorded, of the subdivision or property to which the lines will be extended.
(e) The length of the line extension proposed.
(f) The names of the public utilities that will provide service via the line extension.
(g) Whether the deviation from underground requirements will be permanent or temporary, and, if temporary, the approximate period such facilities will be in place before permanent underground facilities are constructed.
(h) Whether electric or telephone lines can be installed in joint trenches with water, gas, or sewer lines.
(i) Whether a Master Plan, Preliminary Map, or Tentative Map was filed pursuant to the Subdivision Map Act before May 5, 1970, the date of filing, and the agency in which the document was filed.
(j) The minimum parcel size within the subdivision or development.
(k) Whether deed restrictions allow more than one single-family dwelling or accommodation on each parcel or any portions of parcels of less than three acres.
(l) Any unusual environmental circumstances which would cause:
(1) Injury or danger to persons.
(2) Landslides, soil erosion, or exposure of trenches.
(3) Widespread, long-term, or permanent destruction of vegetation.
(4) Serious property damage.
(5) Hindrance to other construction or excessive relocation costs in the case of a temporary deviation.
(m) The identity of scenic highways, state or national parks, or any other areas determined by any governmental agency to be of unusual scenic value to the public within 1,000 feet of the proposed overhead lines; a description of the part of the highway, park, or area within 1,000 feet of the line; and a statement whether the lines will be visible from the highway, park, or area.
(n) Estimates of the costs of undergrounding electric and telephone lines, assuming joint trenching, and of constructing the lines overhead.
(o) Copies of the following documents:
(1) Environmental Impact Statement, Environmental Impact Report, or Negative Declaration prepared by any public agency having permit authority over the project.
(2) Local ordinances requiring undergrounding.