The tariffs must be made available until the combined statewide cumulative rated capacity of eligible generation installed in water and wastewater facilities reaches 250 MW. The Commission’s expansion of the program for non-water and –wastewater facilities includes an additional 228.447 MW of capacity, for a total of 478.447 MW in the program.
Allocated Capacity per Utility
|
Electrical Corporation |
Share of 2005 Coincident Peak Demand (%) |
Water and Wastewater Capacity Allocation
(MW) |
Expanded Capacity Allocation – Non-water and –wastewater
(MW) |
|
SCE |
49.538 |
123.844 |
123.844 |
|
PG&E |
41.841 |
104.603 |
104.603 |
|
SDG&E |
8.022 |
20.055 |
- |
|
PacifiCorp |
0.405 |
1.013 |
- |
|
Sierra |
0.162 |
0.404 |
- |
|
BVES |
0.031 |
0.077 |
- |
|
MU |
0.001 |
0.003 |
- |
|
TOTAL |
100.00 |
250.000 |
228.447 |