Commissioner Assigned: Rachelle B. Chong on March 16, 2006
ALJ Assigned: David K. Fukutome on March 16, 2006
|
Filer Requested Category:
Ratesetting
Preliminary Category:
Ratesetting
Commission Designated Category:
Ratesetting
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY (U39M)
|
|
|
DOCUMENTS
Number of Documents: 158
(only the most current 100 are displayed)
Display all documents for this proceeding
|
Type:
PROPOSED DECISION
|
Filing Date:
November 18, 2008
|
Filed By:
ALJ/FUKUTOME/CPUC
|
|
Description:
Decision Granting Intervenor Compensation to the Utility Reform Network and Vote Solar Initiative for Substantial Contribution to Decision 07-09-004 and Denying Compensation to Agricultural Energy Consumers Association. Opening comments, which shall not exceed 15 pages, are due December 8, 2008. Reply comments,which shall not exceed 5 pages, are due 5 days after the last day for filing comments
|
Type:
REQUEST
|
Filing Date:
September 30, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
for intervenor compensation for contributions to D08-07-045.
|
Type:
COMMENTS
|
Filing Date:
July 7, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply;
|
Type:
COMMENTS
|
Filing Date:
July 7, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; on the proposed decision of Commissioner Chong.
|
Type:
COMMENTS
|
Filing Date:
July 7, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on proposed decision of Commissioner Chong.
|
Type:
COMMENTS
|
Filing Date:
July 7, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; regarding the proposed decision of Commissioner Chong adopting dynamic pricing timetable and rate design guidance for Pacific Gas and Electric Company
|
Type:
COMMENTS
|
Filing Date:
June 30, 2008
|
Filed By:
California Large Energy Consumer Association
|
|
Description:
on the proposed decision of Commissioner Chong on dynamic pricing issues
|
Type:
COMMENTS
|
Filing Date:
June 30, 2008
|
Filed By:
Ice Energy, Inc.
|
|
Description:
(on proposed decision)
|
Type:
COMMENTS
|
Filing Date:
June 30, 2008
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
on Cmmr. Chong's proposed decision adopting dynamic pricing timetable and rate design guidance for PG&E
|
Type:
COMMENTS
|
Filing Date:
June 30, 2008
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
on the decision adopting dynamic pricing timetable and rate design guidance for Pacific Gas and Electric Company
|
Type:
COMMENTS
|
Filing Date:
June 30, 2008
|
Filed By:
California Manufacturers and Technology Association
|
|
Description:
on proposed decision adopting dynamic pricing timetable and rate design guidance
|
Type:
COMMENTS
|
Filing Date:
June 30, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
on the proposed decision of Commissioner Chong
|
Type:
COMMENTS
|
Filing Date:
June 30, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on proposed decision of Commissioner Chong
|
Type:
COMMENTS
|
Filing Date:
June 30, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; on Commissioner Chong's proposed decision
|
Type:
COMMENTS
|
Filing Date:
June 30, 2008
|
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS
|
|
Description:
on the proposed decision of Commissioner Chong Adopting Dynamic Pricing Timetable and Rate Design Guidance for PG&E.
|
Type:
PROPOSED DECISION
|
Filing Date:
June 10, 2008
|
Filed By:
CMMR/CHONG/CPUC
|
|
Description:
Decision adopting dynamic pricing timetable and rate design guidance for Pacific Gas and Electric Company. Opening comments, which shall not exceed 15 pages, are due no later than June 30, 2008. Reply comments are due 5 days after opening comments are filed.
|
Type:
COMMENTS
|
Filing Date:
March 21, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Post workshop; on straw critical peak pricing presentation.
|
Type:
COMMENTS
|
Filing Date:
March 21, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on the March7, 2008 Workshop
|
Type:
COMMENTS
|
Filing Date:
March 21, 2008
|
Filed By:
Kinder Morgan Energy Partners, L.P.
|
|
Description:
Post-Workshop;
|
Type:
COMMENTS
|
Filing Date:
March 21, 2008
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
of the Energy Producers and Users Coalition
|
Type:
COMMENTS
|
Filing Date:
March 21, 2008
|
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATION OF SAN FRANCISCO, GREATER LOS ANGELES, ORANGE COUNTY AN
|
|
Description:
on Dynamic Pricing Workshop Review of Straw CPP Rates for Large Customers
|
Type:
COMMENTS
|
Filing Date:
March 21, 2008
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
|
Type:
RULING
|
Filing Date:
March 10, 2008
|
Filed By:
ALJ/Fukutome/CPUC
|
|
Description:
Granting Motions for Party Status.
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on the Assigned Commissioner's Ruling requesting comments on Draft Timetable and Rate Guidance and Updating Schedule.
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
On the Draft Timetable and Rate Guidance.
|
Type:
MOTION
|
Filing Date:
February 28, 2008
|
Filed By:
Wal-Mart Stores, Inc.
|
|
Description:
For Party Status.
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
Ice Energy, Inc.
|
|
Description:
(In accordance with Assigned Commissioner Rachelle B. Chong's Ruling Requesting Comments on Draft Timetable and Rate Guidance and Updating Schedule ("Ruling") issued
January 23, 2008, and Administrative Law Judge, David K. Fukutome's Ruling Revising the Procedural Schedule, issued February 6, 2008).
|
Type:
MOTION
|
Filing Date:
February 28, 2008
|
Filed By:
Kinder Morgan Energy Partners, L.P.
|
|
Description:
for Party Status.
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
on draft timetable and rate guidance regarding Dynamic Pricing, per Commissioner Chong's Ruling dated January 23, 2008.
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
BUILDING OWNERS AND MANAGERS ASSOCIATIONS OF SAN FRANCISCO, OF GREATER LOS ANGELES, OF ORANGE COUNTY
|
|
Description:
on Assigned Commissioner Ruling Requesting Comments On Draft Timetable and Rate Guidance and Updating Schedule.
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
Wal-Mart Stores, Inc.
|
|
Description:
(per Rulings dated 1/23/08 and 2/6/08).
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
Kinder Morgan Energy Partners, L.P.
|
|
Description:
(per Rulings dated 1/23/08 and 2/6/08).
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
In Response to the Assigned Commissioner's Ruling on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the January 23, 2008 Assigned Commissioner Ruling On Draft Timetable and Rate Guidance and Updating Schedule.
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
California Manufacturers and Technology Association
|
|
Description:
on draft timetable and rate guidance, per Assigned Commissioner's Ruling dated January 23, 2008.
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
(pursuant to the Assigned Commissioner's Ruling (ACR), as modified by the Administrative Law Judge's (ALJ) February 6, 2008 ruling on schedule).
|
Type:
COMMENTS
|
Filing Date:
February 28, 2008
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
On Draft Proposals Contained in the Assigned Commissioner's Ruling on Draft Timetable and Rate Guidance and Updating Schedule.
|
Type:
RULING
|
Filing Date:
February 6, 2008
|
Filed By:
ALJ/FUKUTOME/CPUC
|
|
Description:
revising the procedural schedule.
|
Type:
RULING
|
Filing Date:
January 23, 2008
|
Filed By:
CMMR/CHONG/CPUC
|
|
Description:
Requesting Comments on Draft Timetable and Rate Guidance and Updating Schedule. Draft timetable and revised schedule set forth in Attachments A and B. Comments to be submitted by February 14, 2008.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on the November 2007 Workshop described in the August 22, 2007 Supplemental Scoping Memo and Assigned Commissioner's Ruling updating Issues List, Schedule, and Categorization.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2007
|
Filed By:
California Farm Bureau Federation
|
|
Description:
on the November 5-6 Dynamic Pricing Workshop.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Post-Workshp; regarding dynamic pricing.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2007
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
Post-Workshop; in response to the Assigned Commissioner's Ruling on dynamic pricing issues.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on the Dynamic Pricing Workshops held on November 5-6, 2007.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2007
|
Filed By:
California Manufacturers and Technology Association
Energy Producers and Users Coalition
|
|
Description:
Post-Workshop;
|
Type:
COMMENTS
|
Filing Date:
December 11, 2007
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
Post Workshop; on dynamic pricing issues.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2007
|
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS OF SAN FRANCISCO, GREATER LOS ANGELES, ET AL.
|
|
Description:
on Dynamic Pricing Workshop on November 5 and 6, 2007.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2007
|
Filed By:
California Rice Millers
|
|
Description:
Post-Workshop;
|
Type:
MOTION
|
Filing Date:
December 11, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
Conditional; for Evidentiary Hearings and Post-Workshop Comments.
|
Type:
AMENDMENT
|
Filing Date:
November 16, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
to Request for An Award of Compensation for Substantial Contribution to Decision 07-09-004.
|
Type:
REQUEST
|
Filing Date:
November 6, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
For An Award of Compensation for Substantial Contribution to Decision 07-09-004.
|
Type:
REQUEST
|
Filing Date:
November 6, 2007
|
Filed By:
Vote Solar Initiative
|
|
Description:
For An Award of Compensation.
|
Type:
REQUEST
|
Filing Date:
November 2, 2007
|
Filed By:
Agricultural Energy Consumers Association
|
|
Description:
For an Award of Compensation for Substantial Contribution to D.07-09-004.
|
Type:
RECALENDARED
|
Filing Date:
October 25, 2007
|
Filed By:
DOCKET/ALJ/PUC
|
|
Description:
The petition for modification of D07-09-004 by PG&E and California City-County Streetlight Association originally appeared on October 24, 2007 Daily Calendar. The proceeding number has been added.
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
October 22, 2007
|
Filed By:
CALIFORNIA CITY-COUNTY STREETLIGHT ASSOCIAITION
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of Decision 07-09-004.
|
Type:
COMMENTS
|
Filing Date:
October 19, 2007
|
Filed By:
Califormia Manufacturers and Technology Association
|
|
Description:
Reply; (in response to the comments filed by PG&E, SCE, and CMTA).
|
Type:
COMMENTS
|
Filing Date:
October 19, 2007
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
Reply; On Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
October 19, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; Regarding the Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule, and Categorization.
|
Type:
COMMENTS
|
Filing Date:
October 19, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; On Dynamic Pricing Rate Issues.
|
Type:
COMMENTS
|
Filing Date:
October 19, 2007
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
Reply; In Response to the Assigned Commissioner's August 22, 2007 Ruling Requesting Comments on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
October 19, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; to the Comments on the Rate Design Issues Described In the August 22, 2007 Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule, and Categorization.
|
Type:
COMMENTS
|
Filing Date:
October 19, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; On the Supplemental Scoping Memo and Assigned Commissioner Ruling Updating Issues List, Schedule, and Categorization.
|
Type:
COMMENTS
|
Filing Date:
October 19, 2007
|
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS OF SAN FRANCISCO, GREATER LOS ANGELES, ET AL.
|
|
Description:
Reply; on Supplemental Scoping Memo and Assigned Commissioner's Ruling updating issues list, schedule, and categorization.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
Ice Energy, Inc.
|
|
Description:
on rate design issues.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
Opening; On Dynamic Pricing Issues Raised in Assigned Commissioner's Ruling of August 22, 2007.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
on the Supplemental Scoping Memo and Assigned Commissioner's Ruling updating Issues List, Schedule, and Categorization.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on Questions raised in the August 22, 2007, Supplemental Scoping Memo and Assigned Commissioner's Ruling.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
California Manufacturers and Technology Association
|
|
Description:
(in response to issues listed in the August 22, 2007 Assigned Commissioner's Ruling)
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
on Dynamic Pricing Rate Design Issues.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
Western Power Trading Forum
|
|
Description:
in response to the Assigned Commissioner's Supplemental Scoping Memo requesting Comments on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
DRA/ ANGELOPULO/CPUC
|
|
Description:
in response to the Assigned Commissioner's August 22, 2007, Ruling requesting Comments on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS OF SAN FRANCISCO, GREATER LOS ANGELES, ET AL.
|
|
Description:
on Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule and Categorization.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
California Rice Millers
|
|
Description:
On Dynamic Pricing Rate Design Issues Pursuant to Assignd Commissioner's Ruling of August 22, 2007.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on the Rate Design Issues described in the August 22, 2007, Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule, and Categorization.
|
Type:
COMMENTS
|
Filing Date:
August 27, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
On Proposed Decision of ALJ Fukutome.
|
Type:
COMMENTS
|
Filing Date:
August 23, 2007
|
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS
|
|
Description:
on Interim Opinion Adopting Settlements on Marginal Cost, Revenue Allocation and Rate Design (Proposed Decision of ALJ Fukutome).
|
Type:
SCOPING RULING
|
Filing Date:
August 22, 2007
|
Filed By:
CMMR/CHONG/CPUC
|
|
Description:
Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule, and Categorization. The list of issues and schedule are as set forth. Comments on the Rate Design section are due by October 5, 2007. Reply Comments are due by October 19, 2007. This dynamic pricing phase will be recategorized as quasi-legislative upon confirmation by the Commission.
|
Type:
EXPARTE
|
Filing Date:
August 20, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
SUMMARY: On August 16, 2007 Lad Lorenz, Vice President for San Diego Gas and Electric Company (SDG&E) met with Andy Campbell, advisor to Cmmr. Chong in San Francisco. Also, present was Billy Blattner, CPUC Relations Manager for SDG&E. Lorenz explained SDG&E's concern that the ACR could inadvertently delay adoption of dynamic rates, which are being considered in Phase II of SDG&E's rate case. He added that it is important for SDG&E to implement dynamic rates in conjunction with the roll-out of its Advanced Metering Infrastructure in 2008. Contact Person: Trish Rickard, telephone: (415) 202-9986, email: TRickard@SempraUtilities.com.
|
Type:
RULING
|
Filing Date:
August 15, 2007
|
Filed By:
ALJ/FUKUTOME/CPUC
|
|
Description:
ALJ's Ruling Granting Ice Energy, Inc. Party Status and Allowing Energy Producers and Users Coalition to File Comments Late.
|
Type:
COMMENTS
|
Filing Date:
August 15, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on the Assigned Commissioner's Ruling requesting comments on dynamic pricing issues (late-filed authorized by ALJ Fukutome per email ruling dated 8-20-2007).
|
Type:
MOTION
|
Filing Date:
August 14, 2007
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
To Accept Late-Filed Comments.
|
Type:
COMMENTS
|
Filing Date:
August 14, 2007
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
pursuant to Assigned Commissioner's Ruling dated July 31, 2007 (late-filed authorized by ALJ Fukutome's August 15, 2007 Ruling).
|
Type:
COMMENTS
|
Filing Date:
August 13, 2007
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
August 13, 2007
|
Filed By:
Western Power Trading Forum
|
|
Description:
On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
August 13, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
On the Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.
|
Type:
MOTION
|
Filing Date:
August 13, 2007
|
Filed By:
Ice Energy, Inc.
|
|
Description:
for Party Status.
|
Type:
COMMENTS
|
Filing Date:
August 13, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
In Response to the 7-31-07 Assigned Commissioner's Ruling on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
August 13, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
In Response to the Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
August 13, 2007
|
Filed By:
Ice Energy, Inc.
|
|
Description:
On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
August 13, 2007
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
|
|
Description:
On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
August 13, 2007
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
In Response to the Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.
|
Type:
COMMENTS
|
Filing Date:
August 10, 2007
|
Filed By:
BUILDING OWNERS AND MANAGERS ASSOCIATION
|
|
Description:
On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.
|
Type:
PROPOSED DECISION
|
Filing Date:
August 7, 2007
|
Filed By:
ALJ/FUKUTOME/CPUC
|
|
Description:
Interim Opinion Adopting Settlements on Marginal Cost, Revenue Allocation, and Rate Design. Opening Comments, which shall not exceed 25 pages, are due no later than August 27, 2007. Reply Comments are due 5 days after Opening Comments are filed.
|
Type:
RULING
|
Filing Date:
July 31, 2007
|
Filed By:
CMMR/CHONG/CPUC
|
|
Description:
Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues. Interested parties shall submit comments by August 13, 2007.
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
Building Owners and Managers Associations of San Francisco and California
|
|
Description:
Reply; to Comments of TURN contesting the Commercial Building Master Meter Settlement Agreement.
|
Type:
RULING
|
Filing Date:
May 25, 2007
|
Filed By:
ALJ/FUKUTOME/CPUC
|
|
Description:
ALJ's Ruling on Procedural Matters.
|
Type:
COMMENTS
|
Filing Date:
May 24, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; to Comments of The Utility Reform Network contesting the Commercial Building Master Meter Settlement Agreement.
|
Type:
COMMENTS
|
Filing Date:
May 22, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
contesting the Commercial Building Master Meter Settlement Agreement.
|
Type:
RULING
|
Filing Date:
May 10, 2007
|
Filed By:
ALJ/FUKUTOME/CPUC
|
|
Description:
ALJ's Ruling Shortening Settlement Comment Period. Comments on the proposed Small Light & Power Rate Design Settlement Agreement and Commercial Building Master Meter Settlement Agreement, dated April 27, 2007, and the proposed Agricultural Rate Design Settlement, dated May 3, 2007, shall be filed no later than May 22, 2007. Reply Comments shall be filed by May 24, 2007.
|
Type:
RULING
|
Filing Date:
May 7, 2007
|
Filed By:
ALJ/FUKUTOME/CPUC
|
|
Description:
Granting Limited Intervention.The April 18, 2007 Late-Filed Motion to Intervene of the City and County of San Francisco (City) is granted for the limited purpose of obtaining information related to the proposed Streetlight Rate Design Settlement dated March 16, 2007.
|
DECISIONS
Number of Decisions: 6
|
Decision Number:
D0812054
|
Rendered Date:
December 18, 2008
Effective Date:
December 18, 2008
|
|
Description:
Grants intervenor compensation to The Utility Reform Network and Vote Solar Initiative for substantial contribution to Decision 07-09-004 and denies compensation to Agricultural Energy Consumers Association.
|
Decision Number:
D0807045
|
Rendered Date:
July 31, 2008
Effective Date:
July 31, 2008
|
|
Description:
Adopts dynamic pricing timetable and rate design guidance for Pacific Gas and Electric Company.
|
Decision Number:
D0712036
|
Rendered Date:
December 20, 2007
Effective Date:
December 20, 2007
|
|
Description:
Interim Opinion. Grants petition of Pacific Gas and Electric Company and California City-County Streetlight Association for modification of Decision 07-09-004.
|
Decision Number:
D0709004
|
Rendered Date:
September 6, 2007
Effective Date:
September 6, 2007
|
|
Description:
Interim Opinion. Adopts settlements on marginal cost, revenue allocation, and rate design.
|
Decision Number:
D0705048
|
Rendered Date:
May 24, 2007
Effective Date:
May 24, 2007
|
|
Description:
Grants intervenor compensation award to Agricultural Energy Consumers Association for substantial contributions to Decision 06-11-030.
|
Decision Number:
D0611030
|
Rendered Date:
November 30, 2006
Effective Date:
November 30, 2006
|
|
Description:
Interim Order. Adopts Agricultural Definition Settlement.
|