CPUC Seal  

STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Monterey Peninsula Water Supply Project

(Application A.12-04-019, filed March 29, 2018)

  homeproject descriptionannouncements and schedulecomments and documentsconstruction status
 

Final Environmental Impact Report/
Environmental Impact Statement

acrobat

Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat.

 

Cover [pdf], Dear Reviewer Letter [pdf], Table of Content [pdf], and List of Acronyms [pdf]

Executive Summary [pdf]

1.  Introduction and Background [pdf]

2.  Water Demand, Supplies, and Water Rights [pdf]

3.  Description of the Proposed Project [pdf 5.84mb]

4.  Environmental Setting (Affected Environment), Impacts, and Mitigation Measures
     4.1   Overview [pdf]
     4.2   Geology, Soils, and Seismicity [pdf 3.31mb]
     4.3   Surface Water Hydrology and Water Quality [pdf 3.90mb]
     4.4   Groundwater Resources [pdf 6.81mb]
     4.5   Marine Resources [pdf1.55mb]
     4.6   Terrestrial Biological Resources [pdf 8.23mb]
     4.7   Hazards and Hazardous Materials [pdf]
     4.8   Land Use, Land Use Planning, and Recreation [pdf1.35mb]
     4.9   Traffic and Transportation [pdf]
     4.10 Air Quality [pdf]
     4.11 Greenhouse Gas Emissions [pdf]
     4.12 Noise and Vibration [pdf 1.56mb]
     4.13 Public Services and Utilities [pdf]
     4.14 Aesthetic Resources [pdf 1.11mb]
     4.15 Cultural and Paleontological Resources [pdf 1.23mb]
     4.16 Agriculture and Forestry Resources [pdf]
     4.17 Mineral Resources [pdf]
     4.18 Energy Conservation [pdf]
     4.19 Population and Housing [pdf1.42mb]
     4.20 Socioeconomics and Environmental Justice [pdf]

5.  Alternatives Screening and Analysis
     5.1  
Introduction and Overview [pdf]
     5.2  Alternatives Not Evaluated in Detail [pdf]
     5.3  Alternatives Development, Screening and Evaluation Process [pdf 1.11mb]
     5.4  
Description of Alternatives Evaluated in Detail [pdf 2.47mb]
     5.5  
Alternatives Impact Analysis [pdf 4.48mb]
     5.6  
Environmentally Superior Alternative/Preferred Alternative [pdf]

6.  Other Considerations [pdf]

7.  Report Preparation [pdf]

8.  Draft EIR/EIS Comments and Responses
     8.1   Introduction [pdf]
     8.2   Master Responses [pdf 5.23mb]
     8.3   Federal Agency Comments and Responses [pdf 1.35mb]
     8.4   State Agency Comments and Responses [pdf 1.77mb]
     8.5   Local Agency Comments and Responses [pdf137.4mb]
     8.6   Organization Comments and Responses [pdf 11.7mb]
     8.7   Individual(s) Comments and Responses [pdf10.4mb]
     8.8   Form Letters and Responses [pdf 5.44mb]
     8.9   Draft EIR/EIS Public Meeting Verbal Comments [pdf]

Index [pdf]

Appendices

A.  NOP and NOP Scoping Report [pdf]

A1.  Draft and Final EIR/EIS Distribution List [pdf]

B1. MPWSP Plant Sizing Data: Various Five- and Ten-Year Normal, Dry, and Maximum Month Demand Scenarios [pdf]

B2. State Water Board Final Analysis of the Monterey Peninsula Water Supply Project [pdf 16.0mb]

C1. Coastal Water Elevations and Sea Level Rise Scenarios [pdf 7.0mb]

C2. Analysis of Historic and Future Coastal Erosion with Sea Level Rise [pdf 2.03mb]

C3. Exploratory Borehole Results [pdf]

D1. Modeling Brine Disposal into Moterey Bay - Supplement, Final Report [pdf 3.24mb]

D2. Brine Discharge Diffuser Analysis [pdf]

D3. Ocean Plan Compliance Assessment [pdf 3.42mb]

E1. Lawrence Berkeley National Laboratories Peer Review [pdf 1.12mb]

E2. North Marina Groundwater Model Review, Revisions, and Implementation for Slant Well Pumping Scenarios [pdf 20.0mb]

E3. HWG Hydrogeologic Investigation Technical Report (Part 1) [pdf 100.mb]

E3. HWG Hydrogeologic Investigation Technical Report (Part 2) [pdf 113.0mb]

F.  Special-status Plant and Wildlife Species Considered [pdf]

G1.  Air Quality and Greenhouse Gas Emissions Estimates [pdf 1.55mb]

G2.  Trussel Technologies Inc. Technical Memorandum, Response to CalAm MPWSP DEIR [pdf]

H.  Pure Water Monterey GWR Project Consolidated Final EIR Chapter 2 Project Description [pdf 12.3mb]

I1.  Open-Water and Subsurface Intakes [pdf]

I2.  Component Screening Results - Component Options Not Carried Forward [pdf]

J1. Coastal Water Project EIR Analysis: MPWMD 2006 Estimate of Long-Term Water Needs Compared with Growth Anticipated in Jurisdictions General Plans [pdf]

J2. Secondary Effects of Growth [pdf]

K. Existing Water Conservation and Water Recycling [pdf]

L. Alternative Supply - Demand Scenarios [pdf]

M. Appendices and Attachements to the DEIR/EIS Public Comment Letters (Part 1) [pdf 108mb]

M. Appendices and Attachements to the DEIR/EIS Public Comment Letters (Part 2) [pdf 96.7mb]

N. Resumes [pdf]

O. Agency Coordination and Consultation [pdf 38.2mb]

Website Information

This page is best viewed with Firefox or Internet Explorer. Please report any problems to the .

 

Project Home Page - CPUC Environmental Information - CPUC Home - Top