Original
General Order
95
Section
IV
Strength Requirements for All Classes of
Lines
42.3 Line Crossing Involved Lines
Where one line crosses over another line which in turn is involved in a second crossing in the same span, the grade of construction for the highest line shall be not less than that required for the next lower line.