Topics:

Upcoming Events

R.13-02-008

Proceeding Documents

Phase 3 Interconnection Standards

Events

  • November 13, 2019: Workshop to Consider Standard Renewable Gas Interconnection Tariff
  • August 20, 2019: Workshop to consider Joint Utility Proposal to establish a process for considering interconnection request to allow renewable natural gas blending in pipelines
  • May 23 and 24, 2019: Workshops to Consider a Standard Renewable Natural Gas Interconnection Tariff and an Inquiry into the Standards Required to Inject and Interconnect Renewable Methane and Hydrogen Projects
  • June 11, 2018: Workshop - California Council on Science and Technology presents: Biomethane Report

Phase 3 Interconnection Agreement

Events

  • May 18, 2020: Workshop on Renewable Gas Standard Interconnection Agreement
    • Joint utilities proposed agreement
    • Presentations will be posted here before the event
    • Recording and agenda link to be posted after the event

    Phase 3 Renewable Gas Pipeline Interconnection Incentive Program

    The interconnection incentive program is currently available.  Preliminary reservation applications have been received and are tabulated below.

    To find the interconnection incentive reservation program application form, please check the following utility websites:

     

    Phase 4 SB 1440

    Events

    Phase 4 Hydrogen

    Events

    • January 15, 2020: Webinar Working Group on Hydrogen Injection
      • Joint IOUs provided a brief overview of hydrogen injection standards and research worldwide.  Additionally, the Joint IOUs discussed the Joint IOU Action Plan Matrix, which documents current knowledge of hydrogen blending and proposals for further research. 

      A.19-02-015 SoCalGas & SDG&E's Opt-In Renewable Natural Gas Tariff

      Proceeding Documents

      Events

      R.17-06-015 Dairy Biomethane Pilot Projects

      Proceeding Documents

      Background on Pilot Projects

      SB 1383 requires the CPUC to direct gas corporations to implement not less than five dairy biomethane pilot projects to demonstrate interconnection to the common carrier pipeline system. CPUC consulted with CARB and CDFA on the development of R.17-06-015, the Dairy Biomethane Pilot Rulemaking, for the selection and implementation of these pilot projects.

      Events