Resource-to-busbar mapping ("busbar mapping") is the process of refining the geographically coarse electricity resource portfolios produced in the California Public Utilities Commission's (CPUC) Integrated Resource Plan (IRP) proceeding, into plausible network modeling locations for transmission analysis in the California Independent System Operator's (CAISO) annual Transmission Planning Process (TPP).

The following documents provide busbar mapping results along with other assumptions required for TPP modeling, and associated supporting documentation.

A Modeling Advisory Group webinar was held on May 22, 2020 explaining this material.  Please refer to the 2019-2020 IRP Events and Materials webpage for access to the presentation slides and webinar recording.  

CPUC Staff Report:  Modeling Assumptions for the 2020-2021 TPP

Release 1 (TPP Base Cases), 2/21/2020

Release 2 (TPP Sensitivity Cases), 3/30/2020

Appendices to Report Release 1:

Appendices new to Report Release 2:

Methodology for 2019 IRP Resource-to-Busbar Mapping

Methodology for 2019 IRP Resource-to-Busbar Mapping, 3/30/2020

Background and prior versions of Methodology:

CEC Busbar Mapping Results

Base Case Generation Resources, 2/21/2020

Sensitivity Case Resources, 3/30/2020